Titlebook: Computer-Aided Transit Scheduling; Proceedings, Cambrid Nigel H. M. Wilson Conference proceedings 1999 Springer-Verlag Berlin Heidelberg 19

[复制链接]
楼主: 贪污
发表于 2025-3-26 22:36:58 | 显示全部楼层
发表于 2025-3-27 02:19:46 | 显示全部楼层
An Integrated Approach to Ex-Urban Crew and Vehicle Schedulingparticular settings such as the ex-urban mass transit, where crews are tightly dependent on vehicles’ activity or crews’ dead-headings are highly constrained. In this paper we propose an integrated approach to vehicle and crew scheduling which exploits the network structure of the problem. A heurist
发表于 2025-3-27 06:08:17 | 显示全部楼层
Producing Train Driver Schedules Under Differing Operating Strategieshave efficient operating schedules. Manpower costs are a significant element in any transport organization, and the ability to minimize these is seen as crucial to the effective running of these companies. In addition, the need to try out different operating strategies is gaining in importance as th
发表于 2025-3-27 09:40:31 | 显示全部楼层
Integrated Scheduling of Buses and Drivers, and franchised out to several private companies for operation. The nature of the scheduling problem is different from most of those described at previous workshops, because vehicle and driver schedules are developed simultaneously, but on a line by line basis. The present paper describes work carr
发表于 2025-3-27 15:07:40 | 显示全部楼层
Object Oriented Bus Vehicle Scheduling — the BOOST Systemon, extensibility and reusability. The VAMPIRES algorithm, originated in the 1960s for scheduling train locomotives and later formed the basis of the BUSPLAN system within the BUSMAN package, has been updated using the object-oriented approach and used as the core scheduling algorithm in BOOST. In t
发表于 2025-3-27 19:42:11 | 显示全部楼层
发表于 2025-3-27 22:54:12 | 显示全部楼层
发表于 2025-3-28 02:09:02 | 显示全部楼层
Timetable Synchronization for Buses maximize the number of simultaneous arrivals of buses at the connection nodes (transfer nodes) of the network. The data for the problem are as follows: a bus route network, including connection nodes of the bus routes; the number of bus departures for every bus route in the network, during a given
发表于 2025-3-28 10:10:01 | 显示全部楼层
发表于 2025-3-28 12:37:38 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 吾爱论文网 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
QQ|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-8-23 12:44
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表