找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: New Directions for Operations Research in Manufacturing; Proceedings of a Joi Günter Fandel,Thomas Gulledge,Albert Jones Conference proceed

[复制链接]
楼主: 游牧
发表于 2025-3-28 17:21:23 | 显示全部楼层
Scheduling Semiconductor Test Operations: Optimization and Approximationenter at a time. A disjunctive graph representation of the facility is used to model the interactions of the workcenters. We present algorithms to minimize maximum lateness and number of tardy jobs on testers and batch processing machines. The overall methodology has been implemented on a set of problems based on a real industry setting.
发表于 2025-3-28 19:41:30 | 显示全部楼层
in production planning, facilitylayout, inventory control, tool management and scheduling.Some of these problems can be solved off-line, whileothersmust be treated as real-time problems impacted by thechanging state of the system. Additionally, all of theseproblems have to be dealt with in an integr
发表于 2025-3-29 00:45:13 | 显示全部楼层
Analysis of Production Planning and Control (PPC) Systems as an Efficient Combination of Informationower lies in the formal stringency of its way of proceeding. Some authors see in the activity analysis, or in the consideration of production correspondences closely connected with it, a suitable platform for joining up the theory of production with production planning (Shephard et al. 1977).
发表于 2025-3-29 03:13:06 | 显示全部楼层
The Application of a Parallel Genetic Algorithm to the ,, Flowshop Problemns with respect to an objective. We conjecture that every new problem needs a determination of this necessary condition for a genetic algorithm to work, i. e. a proof by experiment. We implemented an asynchronous parallel genetic algorithm on a UNIX-based computer network. Computational results of the new heuristic are discussed.
发表于 2025-3-29 07:51:03 | 显示全部楼层
Job and Tool Scheduling for Flexible Machining Cellsf job completion times (as measured according to the weighted flow time criterion) and tool movement where the relative importance between these two potentially conflicting performance measures can vary from problem to problem. A heuristic procedure is proposed and evaluated in a experiment that draws on data from industry.
发表于 2025-3-29 12:29:47 | 显示全部楼层
发表于 2025-3-29 19:11:26 | 显示全部楼层
发表于 2025-3-29 21:25:57 | 显示全部楼层
Whither Manufacturing and Operations Research?cuss some of the history of the operations research (OR) profession, make some observations concerning its present state of health, and comment on the important role OR professionals can play in this national effort to help U.S. industry survive and thrive in the next century.
发表于 2025-3-30 01:49:27 | 显示全部楼层
Dispatching Issues in Job Shop Scheduling made which (sub)lot has the highest priority. These competing lots may be sublots of either the same order or different orders. We suggest factors that should be included in a priority function. These factors are considered from both resource perspectives as well as order perspective.
发表于 2025-3-30 07:01:54 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-2 17:42
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表