Titlebook: Low Earth Orbit Satellite Design; George Sebestyen,Steve Fujikawa,Alex Chuchra Book 2018 Springer International Publishing AG 2018 low ear

[复制链接]
楼主: 珍珠无
发表于 2025-3-28 17:55:25 | 显示全部楼层
Electric Power Subsystem Design,cecraft. Electric Power is also often underestimated, resulting in insufficient power to support the “mission creep” requirements of the spacecraft. The EPS design procedure is outlined below. Each of the steps will be discussed and illustrated in more detail later.
发表于 2025-3-28 19:48:01 | 显示全部楼层
Spacecraft Digital Hardware,he size of their memories. Thus, these are no longer major factors in the selection process. However, radiation hardness, sensitivity to SEU, power consumption and I/O capabilities are still properties that influence the choice of digital processors. A list of factors that should be taken into consi
发表于 2025-3-29 01:33:33 | 显示全部楼层
Attitude Determination and Control System (ADACS),on mistake is to call for more stringent accuracy than is required by the payload. For example, if the mission is to simply scan the atmospheric spectrum from the Northern Hemisphere, then pointing much more than 5° is hardly required. Specifying pointing accuracy 1 or 2 orders of magnitude better r
发表于 2025-3-29 03:32:13 | 显示全部楼层
发表于 2025-3-29 10:31:41 | 显示全部楼层
Spacecraft Structure,eparation system dimensions, (2) the launch vehicle loads to the spacecraft structure, (3) the weights of the spacecraft bus and payload components, (4) thermal design and ability to get rid of incident and internally generated heat, (5) the way solar arrays will be mounted, deployed or rotated to p
发表于 2025-3-29 13:35:47 | 显示全部楼层
发表于 2025-3-29 16:54:43 | 显示全部楼层
发表于 2025-3-29 20:39:49 | 显示全部楼层
Integration and Test,then performing thermal, vibration and thermal vacuum tests. After that, the spacecraft is ready to be shipped to the launch site, where it is functionally retested to ensure that no damage was done to the spacecraft. Then, the spacecraft is integrated with the launch vehicle.
发表于 2025-3-30 03:08:40 | 显示全部楼层
Low Cost Design and Development,te a section on the practices used to come up with a very capable and complex spacecraft at a very low cost. The schedule (from contract award to launch) took one day less than one year. In reviewing that chapter now, after having developed 34 spacecraft, I must say that each procedure for keeping c
发表于 2025-3-30 06:16:19 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-6-26 10:17
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表