找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Handbook Factory Planning and Design; Hans-Peter Wiendahl,Jürgen Reichardt,Peter Nyhuis Book 2015 Springer-Verlag Berlin Heidelberg 2015 C

[复制链接]
楼主: 阿谀奉承
发表于 2025-3-25 06:26:45 | 显示全部楼层
https://doi.org/10.1007/978-3-319-70329-9his will be met by equipment in interaction with human labor. This chapter provides an overview of the production technology and equipment for the production of piece products, to the extent which is necessary for the factory planner.
发表于 2025-3-25 08:01:49 | 显示全部楼层
https://doi.org/10.1007/978-1-4842-9297-6play a significant role in the economic success of a factory. This chapter, therefore, addresses first the necessary development of the employee skills, and then the division of labor and responsibility within the organization. The design of the wage system and the working schedule conclude the chap
发表于 2025-3-25 15:05:30 | 显示全部楼层
https://doi.org/10.1007/978-94-015-1023-3ating environment. From a spatial perspective this means providing a changeable yet orderly structure within the immediate visual field of a work area. In particular emphasis needs to be given for labor protection. The design of work places is governed by law in all industrialized countries and are
发表于 2025-3-25 18:20:18 | 显示全部楼层
https://doi.org/10.1007/978-1-349-09930-6urpose of the work area is to enable the production of a salable product. For the functional design of a work area, the order type (customer or stock production), the type of procurement, the organization of production and assembly and the type of production planning and control must be determined.
发表于 2025-3-25 22:03:57 | 显示全部楼层
发表于 2025-3-26 02:37:19 | 显示全部楼层
发表于 2025-3-26 04:36:14 | 显示全部楼层
https://doi.org/10.1007/978-981-19-3850-4ter plan, the characteristics of the project requirements determine not only the forms that will be built but also the safety and security criteria. The chapter describes a scheme how to develop a master plan and the components and show a practical example.
发表于 2025-3-26 10:55:58 | 显示全部楼层
https://doi.org/10.1007/978-1-349-16010-5f media, utilities, rules, regulations as well as ecological and environmental concerns influence a company’s present and future changeability. The multitude of relevant parameters requires a thorough and systematic assessment of possible options. The relevant aspects are treated in this chapter.
发表于 2025-3-26 12:42:52 | 显示全部楼层
发表于 2025-3-26 17:08:01 | 显示全部楼层
https://doi.org/10.1057/9781137370068sed on a strategic positioning have proven themselves useful for all projects—independent of whether the planning is for a new building, an expansion or a re-organization. Since these aspects are frequently neglected in practice, we will explain them thoroughly. Due to the close connection between p
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-8 08:54
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表