Titlebook: Geotechnical Engineering for Disaster Mitigation and Rehabilitation; Proceedings of the 2 Hanlong Liu,An Deng,Jian Chu Conference proceedin

[复制链接]
楼主: 相似
发表于 2025-3-25 06:15:02 | 显示全部楼层
发表于 2025-3-25 10:55:08 | 显示全部楼层
https://doi.org/10.1007/978-3-663-20380-3eagent. The cross-section of stabilized shaft is conceptually divided into small elements in order to examine the characteristics of its heterogeneity due to imperfect mixing. The properties of each element are treated as independently identical. Typically, the unconfmed compressive strength of ceme
发表于 2025-3-25 14:19:45 | 显示全部楼层
发表于 2025-3-25 18:26:01 | 显示全部楼层
发表于 2025-3-25 23:58:08 | 显示全部楼层
Flow Slides of Underwater Sand Deposits in Jamuna River Bed interpretation on sand behaviour. The results of the tests showed that the mica-containing sand from Jamuna River site exhibited contractive or strain-softening behaviour over a wide range of void ratio. The residual strength at the steady-state deformation obtained in the present test scheme was u
发表于 2025-3-26 00:54:27 | 显示全部楼层
发表于 2025-3-26 07:41:26 | 显示全部楼层
Geosynthetic Reinforcement for Riverside Slope Stability of Levees Due to Rapid Drawdownian Analysis of Continua) Slope software, was adopted. Geosynthetic layers were modeled using cable elements with grout properties between geosynthetic and soil. The riverside stability of the levee at different conditions (the average service condition, the high water surge, and drawdown from the s
发表于 2025-3-26 12:33:06 | 显示全部楼层
Study on Earthquake and Typhoon Induced Regional Debris Flows in Ta-Chia River, Taiwan powerful force that moved the sparsely deposited materials into gullies and then triggered the debris flow movement. A strong coupling between the spatial distribution of rainfalls and the occurrence of regional debris flows is also addressed.
发表于 2025-3-26 15:55:33 | 显示全部楼层
Instrumented Full Scale Test and Numerical Analysis to Investigate Performance of Bamboo PIle-Mattreal embankment was performed in several fill stages followed by observation of embankment stability and ground settlement. Field observation indicated that embankment using bamboo pile-mattress system showed adequate stability against slope failure and bearing capacity failure and actual settlement w
发表于 2025-3-26 19:53:41 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-19 18:54
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表