Titlebook: GERT Networks and the Time-Oriented Evaluation of Projects; Klaus Neumann,Ulrich Steinhardt Book 1979 Springer-Verlag Berlin Heidelberg 19

[复制链接]
查看: 8363|回复: 40
发表于 2025-3-21 17:12:15 | 显示全部楼层 |阅读模式
书目名称GERT Networks and the Time-Oriented Evaluation of Projects
编辑Klaus Neumann,Ulrich Steinhardt
视频video
丛书名称Lecture Notes in Economics and Mathematical Systems
图书封面Titlebook: GERT Networks and the Time-Oriented Evaluation of Projects;  Klaus Neumann,Ulrich Steinhardt Book 1979 Springer-Verlag Berlin Heidelberg 19
描述Towards the end of the fifties methods for planning, scheduling,and control of proj­ ects were developed on the basis that the evolution of a project can be associated with a special weighted directed graph, called activity network. In this association, the individual activities of the project correspond to the arcs, the so-called proj­ ect events (beginning or termination of activities) correspond to the nodes, and the durations of the activities correspond to the weights of the respective arcs of the directed graph. 1) Contiguous arcs are assigned to activities which succeed one another immediately. The event corresponding to a node occurs exactly at the time at which all activities which are associated with the arcs leading into the node are terminated. After the occurrence of an event all those activities are be­ gun which correspond to the arcs emanating from the respective node. This implies especially that the evolution of the project has to be uniquely determined before­ hand, that every activity and every event are realized exactly once during the exe­ cution of the project, and that "feedback" (corresponding to cycles in the asso­ ciated network) is not permitted. Many pr
出版日期Book 1979
关键词Networks; Netzplanung; evaluation; production; production planning; simulation
版次1
doihttps://doi.org/10.1007/978-3-642-95363-7
isbn_softcover978-3-540-09705-1
isbn_ebook978-3-642-95363-7Series ISSN 0075-8442 Series E-ISSN 2196-9957
issn_series 0075-8442
copyrightSpringer-Verlag Berlin Heidelberg 1979
The information of publication is updating

书目名称GERT Networks and the Time-Oriented Evaluation of Projects影响因子(影响力)




书目名称GERT Networks and the Time-Oriented Evaluation of Projects影响因子(影响力)学科排名




书目名称GERT Networks and the Time-Oriented Evaluation of Projects网络公开度




书目名称GERT Networks and the Time-Oriented Evaluation of Projects网络公开度学科排名




书目名称GERT Networks and the Time-Oriented Evaluation of Projects被引频次




书目名称GERT Networks and the Time-Oriented Evaluation of Projects被引频次学科排名




书目名称GERT Networks and the Time-Oriented Evaluation of Projects年度引用




书目名称GERT Networks and the Time-Oriented Evaluation of Projects年度引用学科排名




书目名称GERT Networks and the Time-Oriented Evaluation of Projects读者反馈




书目名称GERT Networks and the Time-Oriented Evaluation of Projects读者反馈学科排名




单选投票, 共有 1 人参与投票
 

0票 0.00%

Perfect with Aesthetics

 

1票 100.00%

Better Implies Difficulty

 

0票 0.00%

Good and Satisfactory

 

0票 0.00%

Adverse Performance

 

0票 0.00%

Disdainful Garbage

您所在的用户组没有投票权限
发表于 2025-3-21 21:25:55 | 显示全部楼层
GERT Networks with Basic Element Structures,odes with deterministic exit and, above all, by nodes with AND entrance or with IOR entrance. In this chapter we treat GERT networks which, on one hand, contain non-STEOR nodes but which, on the other hand, are still relatively easily evaluated, and for which, as with STEOR networks, exactly one tar
发表于 2025-3-22 04:11:29 | 显示全部楼层
Evaluation of General GERT Networks,ich also contain non-STEOR nodes outside of pre-basic element structures. This procedure, which determines the activation distribution of the sinks of an admissible GERT network (compare section 1.4, in particular (1.4.1), (1.4.2), (1.4.3)), requires a relatively great computational effort. Except f
发表于 2025-3-22 05:24:03 | 显示全部楼层
GERT Networks with Time-dependent Arc Weights, the durations of the individual activities are independent of the time of occurrence of the initial events of these activities (compare (1.2.5)). Many projects, however, for which the time planning is to be carried out by means of GERT networks do not satisfy this restriction.
发表于 2025-3-22 10:39:25 | 显示全部楼层
Simulation, as we have seen in chapter 4. As a rule, it is therefore recommended to evaluate such networks by suitable simulation methods .. For this purpose PRITSKER et al. have developed several simulation programs, for example, the program GERTS III and its improved versions GERTS 111Q (for the simulation o
发表于 2025-3-22 16:11:11 | 显示全部楼层
https://doi.org/10.1007/978-3-662-24832-4 a homogeneous MARKOV renewal process. Building upon results from the theory of these processes we shall give in sections 2.2 and 2.3 a very effective method for the evaluation of STEOR networks. The resulting algorithm is in particular computationally superior to the method based on the so-called M
发表于 2025-3-22 18:46:08 | 显示全部楼层
发表于 2025-3-22 23:47:29 | 显示全部楼层
发表于 2025-3-23 03:50:16 | 显示全部楼层
发表于 2025-3-23 06:39:16 | 显示全部楼层
https://doi.org/10.1007/978-3-7091-3962-2 as we have seen in chapter 4. As a rule, it is therefore recommended to evaluate such networks by suitable simulation methods .. For this purpose PRITSKER et al. have developed several simulation programs, for example, the program GERTS III and its improved versions GERTS 111Q (for the simulation o
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-26 10:09
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表