找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Civil Engineering Quantities; Ivor H. Seeley Textbook 1993Latest edition Ivor H. Seeley 1993 civil engineering.concrete.masonry

[复制链接]
楼主: ONSET
发表于 2025-3-25 04:05:44 | 显示全部楼层
Religiosität in der säkularisierten WeltThe rules for measurement of work in this class cover timber components, timber decking, and metal fittings and fastenings to the timber-work. The timber components are those used in permanent civil engineering work such as jetty timbers and fendering. Carpentry and joinery work to buildings is measured in accordance with Class Z.
发表于 2025-3-25 11:17:52 | 显示全部楼层
发表于 2025-3-25 12:42:46 | 显示全部楼层
发表于 2025-3-25 19:20:01 | 显示全部楼层
发表于 2025-3-25 22:26:55 | 显示全部楼层
Measurement of Ground Investigation, Geotechnical Processes, Demolition and Site Clearance,Ground or site investigation may be part of a construction contract or be a separate contract wholly concerned with this activity.
发表于 2025-3-26 02:57:29 | 显示全部楼层
Measurement of Earthworks,Earthworks form a major part of most civil engineering contracts. The pricing of this work is made difficult by its relatively uncertain nature and extent and the effect of weather and water. The measurement rules attempt to recognise these factors and to permit the tenderer to make allowance for them.
发表于 2025-3-26 06:13:06 | 显示全部楼层
Measurement of Brickwork, Blockwork, Masonry, Painting, Waterproofing and Simple Building Works incThis chapter covers several work sections from wall claddings to painting and waterproofing, with some common measurement principles running through them.
发表于 2025-3-26 09:47:28 | 显示全部楼层
Measurement of Piling,Some piling activities are very appropriately covered by method-related charges. For example, the transport of piling plant and equipment to the site and the erection of stagings can be covered by fixed charges and the operation of piling plant by time-related charges.
发表于 2025-3-26 14:12:11 | 显示全部楼层
发表于 2025-3-26 18:55:32 | 显示全部楼层
Measurement of Metalwork,A considerable proportion of the cost of steelwork is in fabrication where activities such as welding on fillets and cutting holes are entailed. Hence detailed drawings of connections and fittings are necessary at the tendering stage and this is assumed in the rules for measurement.
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 吾爱论文网 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
QQ|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-8-17 13:50
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表