Titlebook: Beyond Manufacturing Resource Planning (MRP II); Advanced Models and Andreas Drexl,Alf Kimms Book 1998 Springer-Verlag Berlin Heidelberg 1

[复制链接]
楼主: antibody
发表于 2025-3-28 18:32:56 | 显示全部楼层
发表于 2025-3-28 21:56:31 | 显示全部楼层
发表于 2025-3-29 00:49:48 | 显示全部楼层
Maintaining Robust Schedules by Fuzzy Reasoningonly the most likely duration of operations. This schedule is iteratively “repaired” until some threshold evaluation is found. A repair is found with a local search procedure based on tabu search. Finally, we show which events can lead to reactive scheduling and how this is supported by the repair s
发表于 2025-3-29 06:46:31 | 显示全部楼层
Book 1998we received papers for this issue, we discovered that MRP II is a topic about which not only management scientists show interest. As the list of authors proves, industrial engineers, computer scientists, and-operations researchers from academia as well as practitioners have contributed to this book.
发表于 2025-3-29 09:03:47 | 显示全部楼层
https://doi.org/10.1057/9781137305497me Planning contrary to an ordinary reorder point system uses time as a decision variable instead of quantity. Cover-Time Planning has like Kanban a built in restriction of work-in-process. Not until previous production is consumed a new production is initiated.
发表于 2025-3-29 11:54:57 | 显示全部楼层
https://doi.org/10.1007/978-3-662-03742-3Autodesk Inventor; Manufacturing; algorithms; capacity; control; control theory; decision making; fuzzy rea
发表于 2025-3-29 17:17:11 | 显示全部楼层
978-3-642-08393-8Springer-Verlag Berlin Heidelberg 1998
发表于 2025-3-29 22:21:52 | 显示全部楼层
发表于 2025-3-30 00:15:26 | 显示全部楼层
https://doi.org/10.1057/9781137305497. customer service, manufacturing efficiency and inventory investment, involving both market and manufacturing insights. Master scheduling has traditionally been treated as a material-based planning tool, e.g. in the MRP II (manufacturing resource planning) approach to master scheduling. Capacity is
发表于 2025-3-30 04:19:02 | 显示全部楼层
https://doi.org/10.1057/9781137305497 MPS is selected out of 192 alternative MPS determined by using a Cell Loading software in a Cellular Manufacturing environment. The software is used to help implement a Knowledge-Based Finite Schedule Material Requirements Planning (MRP II) in a jewelry manufacturing plant. The knowledge base syste
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-6-29 19:02
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表