Titlebook: Beyond Manufacturing Resource Planning (MRP II); Advanced Models and Andreas Drexl,Alf Kimms Book 1998 Springer-Verlag Berlin Heidelberg 1

[复制链接]
楼主: antibody
发表于 2025-3-23 10:27:40 | 显示全部楼层
Maintaining Robust Schedules by Fuzzy Reasoningory, it is undesirable to reschedule from scratch in such cases. Since the supplier of raw materials and clients will be prepared for the predicted schedule it is important to change only those features of the schedule that are necessary..We show how on one side fuzzy logic can be used to support th
发表于 2025-3-23 16:43:52 | 显示全部楼层
发表于 2025-3-23 20:15:56 | 显示全部楼层
发表于 2025-3-24 01:26:44 | 显示全部楼层
发表于 2025-3-24 03:42:14 | 显示全部楼层
https://doi.org/10.1057/9781137305497ant problem is tackled through a flexible definition of product structures which forms the basis for product configuration. Industrial examples demonstrate how such a strategy can be implemented successfully.
发表于 2025-3-24 09:37:30 | 显示全部楼层
https://doi.org/10.1057/9781137305497sfully attacked in the recent past. Furthermore, lot size and sequence decisions are usually not integrated as it ought to be for the short-term planning. This paper reviews the history of multi-level lot sizing from the very early work to the state-of-the-art.
发表于 2025-3-24 13:09:21 | 显示全部楼层
https://doi.org/10.1007/978-3-030-65439-9nt heuristics are developed to improve the schedule after re-insertion. The computational study showed that the approach of using re-insertion heuristics combined with local adjustment heuristics performs very well.
发表于 2025-3-24 18:43:39 | 显示全部楼层
Global Dynamics of Social Policyroduction we investigate different sequencing policies and introduce an extended heuristic for the case of color-batch-sequencing. For different types of objectives the performance of the heuristics presented is analyzed, taking known heuristics into consideration.
发表于 2025-3-24 19:07:33 | 显示全部楼层
Global Dynamics of Social Policyf capacity and work. A suggestion to integrate the strategy into production planning and control (PPC) on the planning level has been generated. The objective of this approach is to develop the present open loop control realised in PPC into a closed loop control with defined control and reference variables.
发表于 2025-3-25 02:04:23 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-6-29 18:51
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表