找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Shop Floor Control Systems; From design to imple Alfred Bauer,Richard Bowden,Gerard J. Lyons Book 1994 Chapman & Hall 1994 Information Tech

[复制链接]
楼主: Coarse
发表于 2025-3-28 14:34:30 | 显示全部楼层
发表于 2025-3-28 19:50:48 | 显示全部楼层
发表于 2025-3-29 02:20:28 | 显示全部楼层
s clear that this production lead time is, for the majority of manufacturing firms, greatly in excess of the actual processing or manufacturing time. There are many reasons for this, among them poor coordination between the sales and manufacturing function. Some are within the control of the manufacturing fun978-0-412-58150-2978-94-011-1296-3
发表于 2025-3-29 06:38:46 | 显示全部楼层
发表于 2025-3-29 07:38:54 | 显示全部楼层
A structured functional model for shop floor controln the architecture, that of FC. In our description of FC, we recognized the link between the production environment design element and the control element. Then taking each of the two elements in turn we described the individual tasks of each one.
发表于 2025-3-29 11:55:33 | 显示全部楼层
发表于 2025-3-29 17:24:32 | 显示全部楼层
Implementation of a PAC systemuding the integration with existing applications (such as MRP and data collection systems), and the promotion of PAC, as a viable operational production control method, among those currently responsible for production operations.
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-4 23:13
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表