Titlebook: Robust and Online Large-Scale Optimization; Models and Technique Ravindra K. Ahuja,Rolf H. Möhring,Christos D. Zaro Book 2009 Springer-Verl

[复制链接]
查看: 49064|回复: 62
发表于 2025-3-21 17:28:52 | 显示全部楼层 |阅读模式
书目名称Robust and Online Large-Scale Optimization
副标题Models and Technique
编辑Ravindra K. Ahuja,Rolf H. Möhring,Christos D. Zaro
视频video
丛书名称Lecture Notes in Computer Science
图书封面Titlebook: Robust and Online Large-Scale Optimization; Models and Technique Ravindra K. Ahuja,Rolf H. Möhring,Christos D. Zaro Book 2009 Springer-Verl
描述.Scheduled transportation networks give rise to very complex and large-scale networkoptimization problems requiring innovative solution techniques and ideas from mathematical optimization and theoretical computer science. Examples of scheduled transportation include bus, ferry, airline, and railway networks, with the latter being a prime application domain that provides a fair amount of the most complex and largest instances of such optimization problems. Scheduled transport optimization deals with planning and scheduling problems over several time horizons, and substantial progress has been made for strategic planning and scheduling problems in all transportation domains...This state-of-the-art survey presents the outcome of an open call for contributions asking for either research papers or state-of-the-art survey articles. We received 24 submissions that underwent two rounds of the standard peer-review process, out of which 18 were finally accepted for publication...The volume is organized in four parts: Robustness and Recoverability, Robust Timetabling and Route Planning, Robust Planning Under Scarce Resources, and Online Planning: Delay and Disruption Management..
出版日期Book 2009
关键词Graph; algorithms; disruption management; performance; railway systems; recoverable robustness; reliabilit
版次1
doihttps://doi.org/10.1007/978-3-642-05465-5
isbn_softcover978-3-642-05464-8
isbn_ebook978-3-642-05465-5Series ISSN 0302-9743 Series E-ISSN 1611-3349
issn_series 0302-9743
copyrightSpringer-Verlag Berlin Heidelberg 2009
The information of publication is updating

书目名称Robust and Online Large-Scale Optimization影响因子(影响力)




书目名称Robust and Online Large-Scale Optimization影响因子(影响力)学科排名




书目名称Robust and Online Large-Scale Optimization网络公开度




书目名称Robust and Online Large-Scale Optimization网络公开度学科排名




书目名称Robust and Online Large-Scale Optimization被引频次




书目名称Robust and Online Large-Scale Optimization被引频次学科排名




书目名称Robust and Online Large-Scale Optimization年度引用




书目名称Robust and Online Large-Scale Optimization年度引用学科排名




书目名称Robust and Online Large-Scale Optimization读者反馈




书目名称Robust and Online Large-Scale Optimization读者反馈学科排名




单选投票, 共有 1 人参与投票
 

0票 0.00%

Perfect with Aesthetics

 

0票 0.00%

Better Implies Difficulty

 

1票 100.00%

Good and Satisfactory

 

0票 0.00%

Adverse Performance

 

0票 0.00%

Disdainful Garbage

您所在的用户组没有投票权限
发表于 2025-3-21 22:27:49 | 显示全部楼层
发表于 2025-3-22 01:11:55 | 显示全部楼层
发表于 2025-3-22 05:04:25 | 显示全部楼层
发表于 2025-3-22 09:22:47 | 显示全部楼层
Light Robustnessms, one is typically required to determine a robust solution, i.e., a possibly suboptimal solution whose feasibility and cost is not affected heavily by the change of certain input coefficients. Two main classes of methods have been proposed in the literature to handle uncertainty: stochastic progra
发表于 2025-3-22 15:38:13 | 显示全部楼层
发表于 2025-3-22 20:26:06 | 显示全部楼层
A Bicriteria Approach for Robust Timetablingm or of a solution have been suggested. However, there is always a trade-off between the best possible solution and a robust solution, called the price of robustness. In this paper, we analyze this trade-off using the following bicriteria approach. We treat an optimization problem as a bicriteria pr
发表于 2025-3-22 23:24:14 | 显示全部楼层
Meta-heuristic and Constraint-Based Approaches for Single-Line Railway Timetablingigence, which are able to cope with large scale problems as those in single-line railway timetable optimization. Timetable design is a central problem in railway planning. In the basic timetabling problem, we are given a line plan as well as demand and infrastructure information. The goal is to comp
发表于 2025-3-23 02:43:47 | 显示全部楼层
发表于 2025-3-23 07:23:30 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-3 21:26
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表