找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Quality, Warranty and Preventive Maintenance; Izzet Sahin,Hakan Polatoglu Book 1998 Springer Science+Business Media New York 1998 Business

[复制链接]
查看: 30832|回复: 39
发表于 2025-3-21 17:56:08 | 显示全部楼层 |阅读模式
书目名称Quality, Warranty and Preventive Maintenance
编辑Izzet Sahin,Hakan Polatoglu
视频video
丛书名称International Series in Operations Research & Management Science
图书封面Titlebook: Quality, Warranty and Preventive Maintenance;  Izzet Sahin,Hakan Polatoglu Book 1998 Springer Science+Business Media New York 1998 Business
描述.Quality, Warranty and Preventive Maintenance. examines theimpact of product quality on warranty and maintenance costs andstrategies, from the perspectives of both manufacturers and users. Inaddition, the theories of warranty and preventive maintenance areintroduced and discussed. Common wisdom supports the notion thatbetter product quality means lower warranty costs for themanufacturer, and lower maintenance costs for the users of amanufactured product. This proposition is examined in some detail onthe basis of failure time models. The authors investigate what exactlybetter quality means in warranty and maintenance management, and howit impacts warranty policies and costs for the manufacturer, andreplacement and maintenance strategies and costs for the users. Inmeasuring quality improvement, the main concepts and tools used arethose of stochastic ordering and mixture models. The theoretical baseof the work is a time-varying failure-rectification process. Thisprocess includes, as special cases, replacement, minimal repair, andimperfect repair, as alternative rectification modes that may beavailable to the manufacturer or the user in warranty-servicing ormaintaining a product. In ad
出版日期Book 1998
关键词Business Administration; distribution; management; probability
版次1
doihttps://doi.org/10.1007/978-1-4615-5557-5
isbn_softcover978-1-4613-7541-8
isbn_ebook978-1-4615-5557-5Series ISSN 0884-8289 Series E-ISSN 2214-7934
issn_series 0884-8289
copyrightSpringer Science+Business Media New York 1998
The information of publication is updating

书目名称Quality, Warranty and Preventive Maintenance影响因子(影响力)




书目名称Quality, Warranty and Preventive Maintenance影响因子(影响力)学科排名




书目名称Quality, Warranty and Preventive Maintenance网络公开度




书目名称Quality, Warranty and Preventive Maintenance网络公开度学科排名




书目名称Quality, Warranty and Preventive Maintenance被引频次




书目名称Quality, Warranty and Preventive Maintenance被引频次学科排名




书目名称Quality, Warranty and Preventive Maintenance年度引用




书目名称Quality, Warranty and Preventive Maintenance年度引用学科排名




书目名称Quality, Warranty and Preventive Maintenance读者反馈




书目名称Quality, Warranty and Preventive Maintenance读者反馈学科排名




单选投票, 共有 0 人参与投票
 

0票 0%

Perfect with Aesthetics

 

0票 0%

Better Implies Difficulty

 

0票 0%

Good and Satisfactory

 

0票 0%

Adverse Performance

 

0票 0%

Disdainful Garbage

您所在的用户组没有投票权限
发表于 2025-3-21 23:35:35 | 显示全部楼层
发表于 2025-3-22 02:27:09 | 显示全部楼层
0884-8289 ndimperfect repair, as alternative rectification modes that may beavailable to the manufacturer or the user in warranty-servicing ormaintaining a product. In ad978-1-4613-7541-8978-1-4615-5557-5Series ISSN 0884-8289 Series E-ISSN 2214-7934
发表于 2025-3-22 08:08:06 | 显示全部楼层
发表于 2025-3-22 12:21:05 | 显示全部楼层
发表于 2025-3-22 16:24:09 | 显示全部楼层
Book 1998ical baseof the work is a time-varying failure-rectification process. Thisprocess includes, as special cases, replacement, minimal repair, andimperfect repair, as alternative rectification modes that may beavailable to the manufacturer or the user in warranty-servicing ormaintaining a product. In ad
发表于 2025-3-22 18:37:13 | 显示全部楼层
发表于 2025-3-23 01:00:59 | 显示全部楼层
Extended Warranties,anty (hereafter referred to as the .), it is timed to take effect immediately following the expiration of this warranty. Service contracts are also sold in the market place to maintain products that are not covered by a base warranty. We shall refer to these simply as ..
发表于 2025-3-23 02:29:38 | 显示全部楼层
Preventive Maintenance,epair-effort policies for repairable units. We also assess the value to the user in preventive maintenance of outgoing inspection in manufacturing, and the value of information regarding the true system reliability. This section is based on the traditional long-term-average-cost criteria, which are reviewed in Section 6.1.
发表于 2025-3-23 09:00:39 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-2 07:31
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表