找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Metaheuristics for Production Systems; El-Ghazali Talbi,Farouk Yalaoui,Lionel Amodeo Book 2016 Springer International Publishing AG, part

[复制链接]
楼主: Auditory-Nerve
发表于 2025-3-28 18:38:37 | 显示全部楼层
发表于 2025-3-28 22:12:26 | 显示全部楼层
发表于 2025-3-28 23:58:26 | 显示全部楼层
发表于 2025-3-29 05:47:41 | 显示全部楼层
,Lévy Strategy Based Metaheuristic for Smart Grid, in their boundary conditions. It results in some unbalanced distribution of loads, provoking thus overloads of someand a reduction of the stability margin of the electrical system. FACTS (Flexible Alternative Current Transmission System) allow to control transits of potencies in an uninterrupted ma
发表于 2025-3-29 09:00:38 | 显示全部楼层
Minimising Safety Stock and Lead Time in Production Systems Under Guaranteed-Service Time Models by more products are manufactured, subject to a stochastic demand. The first part of the problem is to configure the SC given that manufacturers have one or more options to perform every supplying, assembly, and delivery stage. Then, a certain amount of inventory should be placed on each stage to ensu
发表于 2025-3-29 13:59:23 | 显示全部楼层
Tabu Search Approaches for Two Car Sequencing Problems with Smoothing Constraints,, where cars must be scheduled before production in an order respecting various constraints (colors, optional equipments, due dates, etc.), while avoiding overloading some important resources. The first objective of the car industry is to assign a production day to each customer-ordered car and the
发表于 2025-3-29 17:14:27 | 显示全部楼层
Investigations on Performance Evaluation of Scheduling Heuristics and Metaheuristics in a Parallel gnificant part of scheduling problems studies deal with resources that are always available, but this assumption cannot be satisfied in many practical situations. This paper presents the results of a simulation study of parallel machines environment when each job is characterized by different non-re
发表于 2025-3-29 21:40:13 | 显示全部楼层
Scheduling Complex Manufacturing Systems Using a Genetic Algorithm,combine features of both project and flexible manufacturing systems that include alternative processing routes, parallel execution of manufacturing operations, multiple options for machine selection, and job recirculation, among others. The proposed chromosome representation uses a combination of in
发表于 2025-3-30 00:35:10 | 显示全部楼层
发表于 2025-3-30 07:55:51 | 显示全部楼层
Integrated Planning and Scheduling with Dynamic Analysis and Control of Service Level and Costs,uncertain and perturbed execution environment is considered. The study has been performed with the objective to consider at the integrated level the performance of the master planning (i.e., service level and net profit) and schedule execution control. As the methodical basis of such an integrated c
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-11 23:29
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表