书目名称 | Measuring Time |
副标题 | Improving Project Pe |
编辑 | Mario Vanhoucke |
视频video | |
概述 | Focuses on recent research in EVM and tests alternative approaches to the same problems.Based on author’s award-winning research.Applicable to a broad range of projects in all aspects of production |
丛书名称 | International Series in Operations Research & Management Science |
图书封面 |  |
描述 | .Meant to complement rather than compete with the existing books on the subject, this book deals with the project performance and control phases of the project life cycle to present a detailed investigation of the project’s time performance measurement methods and risk analysis techniques in order to evaluate existing and newly developed methods in terms of their abilities to improve the corrective actions decision-making process during project tracking. As readers apply what is learned from the book, EVM practices will become even more effective in project management and cost engineering. Individual chapters look at simulation studies in forecast accuracy; schedule adherence; time sensitivity; activity sensitivity; and using top-down or bottom-up project tracking. Vanhoucke also offers an actual real-life case study, a tutorial on the use of ProTrack software (newly developed based on his research) in EVM, and conclusions on the relative effectiveness for each technique presented.. |
出版日期 | Book 2009 |
关键词 | Fundament; Simulation; Stab; cost engineering; earned value management; linear optimization; performance m |
版次 | 1 |
doi | https://doi.org/10.1007/978-1-4419-1014-1 |
isbn_softcover | 978-1-4614-2537-3 |
isbn_ebook | 978-1-4419-1014-1Series ISSN 0884-8289 Series E-ISSN 2214-7934 |
issn_series | 0884-8289 |
copyright | Springer-Verlag US 2009 |