找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Logistics Management; Contributions of the Dirk Mattfeld,Thomas Spengler,Martin Grunewald Conference proceedings 2016 Springer Internationa

[复制链接]
楼主: Considerate
发表于 2025-3-27 00:05:43 | 显示全部楼层
发表于 2025-3-27 02:23:18 | 显示全部楼层
Integration of Cultural Aspects in Supplier Evaluation cultural criteria should be included in supplier evaluation and selection processes in order to anticipate and to avoid possible problems. Although there are recommended cultural criteria in literature, we do not know much about the application of cultural criteria in supplier evaluation. In this p
发表于 2025-3-27 05:36:48 | 显示全部楼层
发表于 2025-3-27 13:02:00 | 显示全部楼层
Coordination in Multimodal Supply Chains: Drafting an Agent-Based Exchangeike e.g. LOGFOR, CODE24 and CENTRAL EUROPE, make efforts to achieve progress in this area. In this paper an already implemented and tested software prototype for the configuration of multimodal supply chains is presented. It is described how this prototype, which emerged from the CODE24 project, is
发表于 2025-3-27 16:13:33 | 显示全部楼层
Flexibility of 3PL Contracts: Practical Evidence and Propositions on the Design of Contract Flexibillenge to 3PL providers and clients. Contracts need to enable handling of changing requirements and contingencies that arise during contract terms. Contracts are designed flexible utilising specific flexibility mechanisms. These flexibility mechanisms reveal strengths and weaknesses depending on rela
发表于 2025-3-27 18:55:52 | 显示全部楼层
Extended Model Formulation of the Facility Layout Problem with Aisle Structure. Traditionally this is a procedure of sequential steps. In recent literature there exist a few approaches to handle layout arrangement and aisle structure simultaneously using heuristics. Only one approach could be found to solve it exactly, but with a lack of exactness due to its discrete represen
发表于 2025-3-27 23:57:46 | 显示全部楼层
Integrated Facility Location, Capacity, and Production Planning in a Multi-Commodity Closed Supply C consisting of common components is studied. The components can be remanufactured or can be purchased new from suppliers. It is assumed that products are returned by customers to the same facilities where the final products are sold. Transportation between facilities of the same type, i.e. redistrib
发表于 2025-3-28 02:37:51 | 显示全部楼层
Integrated Make-or-Buy and Facility Layout Problem with Multiple Productsfter make-or-buy decisions and capacity planning of a firm, and belong to the lowest level in the hierarchy of tactical production decisions. Sequential decision making neglects however the potential interaction between consecutive planning levels and may lead to inefficiencies. We propose an approa
发表于 2025-3-28 08:55:52 | 显示全部楼层
发表于 2025-3-28 12:00:27 | 显示全部楼层
A Lot Streaming Model for a Re-entrant Flow Shop Scheduling Problem with Missing Operationsing, paint shops and rework operations. This paper proposes a lot streaming formulation for a re-entrant flow shop scheduling problem with missing operations. The examined objective values are makespan and the sum of completion times. The model is compared to an existing approach. In addition the im
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-6-25 12:14
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表