找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Ecological Research at the Offshore Windfarm alpha ventus; Challenges, Results Federal Maritime and Hydrographic Agency,Federal M Book 201

[复制链接]
楼主: HAND
发表于 2025-3-26 21:48:24 | 显示全部楼层
发表于 2025-3-27 03:46:03 | 显示全部楼层
发表于 2025-3-27 06:32:00 | 显示全部楼层
Oceanographic and geological research at ,: Instruments for predicting environmental conditions and rs (e.g. wave, tide and current), and sediment shifting in the windfarm. In the absence of in-situ measurements, a combination of fixed single-beam echosounders and full-coverage multibeam echosounding was applied to acquire a spatio-temporal dataset of scour dynamics at . ventus.
发表于 2025-3-27 10:20:04 | 显示全部楼层
Marine habitat modelling for harbour porpoises in the German Bightle of describing patterns and dynamics of feeding habitats. As the modelling depends on the availability of coherent oceanographic and pressure data for the entire German Bight, the approach used combines hydrodynamic and noise models designed for the purpose.
发表于 2025-3-27 14:26:48 | 显示全部楼层
Noise mitigation systems and low-noise installation technologies on relevant primary and secondary noise mitigation techniques (adjustment of piling energy, impulse prolongation, bubble curtains, hydro sound dampers, casings, cofferdams) and on selected low-noise installation technologies (vibro piling, drilling, gravity based foundations, suction buckets).
发表于 2025-3-27 19:39:00 | 显示全部楼层
发表于 2025-3-28 01:02:12 | 显示全部楼层
发表于 2025-3-28 04:48:06 | 显示全部楼层
The Spatial Offshore Grid Plan for the German Exclusive Economic Zonen defines the power cable routes and sites for the entire required grid infrastructure in the EEZ up to the 12 nm border. The Grid Plan for the German EEZ in the North Sea and the accompanying Environmental Report were issued in February 2013 after two national and international consultations.
发表于 2025-3-28 08:38:42 | 显示全部楼层
The , offshore test sitearine grid connection proved reliable too, recording not a single interruption. Each year, . fed 267 GWh of power into the German grid, sufficient to supply approximately 70,000 households. It is the result of hard labour and a unique combined effort on the German high seas.
发表于 2025-3-28 12:46:57 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 吾爱论文网 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
QQ|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-11-14 03:22
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表