找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Deep Foundations for Infrastructure Development in India; Proceedings of DFI-I Boominathan Adimoolam,Anirudhan I. V.,Amit Prashan Conferenc

[复制链接]
楼主: 悲伤我
发表于 2025-3-25 06:27:37 | 显示全部楼层
A Study on the Evaluation of Pile Bearing Capacity Factor and Adhesion Factor in IS 2911 pile foundations. The given charts have been compared with various models specified in the existing literature and international standards for the calculation of N. and α for both driven and bored piles and, hence, the basis of Indian Standard charts has been identified. Moreover, it is evident tha
发表于 2025-3-25 07:31:26 | 显示全部楼层
Challenges of Earthen Cofferdam in Deep Excavations for Waterfront Structures, a Case Studyinside slope of the embankment had started sliding due to continuous dewatering. The design and execution of deep excavation with earthen Cofferdam for waterfront structures are challenging. The selection of filling material for embankment formation and dewatering techniques plays a vital role in th
发表于 2025-3-25 14:14:43 | 显示全部楼层
发表于 2025-3-25 19:01:57 | 显示全部楼层
Effects of Change in the Support System on Temporary Secant Pile Walls should be designed and checked for the critical forces from both permanent stage and construction stages. Since secant piles are used as a temporary retaining wall, only construction stage analysis is carried out to get the governing forces and deformation. In construction stage analysis, soil lay
发表于 2025-3-25 22:41:14 | 显示全部楼层
发表于 2025-3-26 00:56:18 | 显示全部楼层
发表于 2025-3-26 06:50:06 | 显示全部楼层
发表于 2025-3-26 11:11:45 | 显示全部楼层
How Choice of Foundation Can Alter the Fate of a Bridge Project—Three Case Studiesee interesting case studies of past bridge projects, to demonstrate how correct choice of foundation can help to meet the project commitments, while the wrong choice of foundation can lead to a huge delay in project completion, leading to time and cost overrun.
发表于 2025-3-26 15:52:24 | 显示全部楼层
发表于 2025-3-26 18:09:23 | 显示全部楼层
https://doi.org/10.1007/978-1-4842-6180-4ee interesting case studies of past bridge projects, to demonstrate how correct choice of foundation can help to meet the project commitments, while the wrong choice of foundation can lead to a huge delay in project completion, leading to time and cost overrun.
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-3 12:14
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表