找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Contemporary Challenges of Transport Systems and Traffic Engineering; 13th Scientific and Elżbieta Macioszek,Grzegorz Sierpiński Conferenc

[复制链接]
楼主: Disclose
发表于 2025-3-30 08:44:40 | 显示全部楼层
发表于 2025-3-30 13:21:15 | 显示全部楼层
发表于 2025-3-30 17:00:35 | 显示全部楼层
发表于 2025-3-30 22:27:34 | 显示全部楼层
https://doi.org/10.1007/978-3-663-12425-2were optimised. The following results have been obtained: cost calculation for post-tensioned runway was about 6.4 million € lower than for reinforced runway, which is 18 % of the total cost. Duration of construction of post-tensioned runway was estimated to require 10 months whereas reinforced takes with an 8 % more time.
发表于 2025-3-31 02:23:09 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 吾爱论文网 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
QQ|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-8-26 01:13
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表