书目名称 | Capacitated Lot Sizing Problems in Process Industries |
编辑 | Ravi Ramya,Chandrasekharan Rajendran,K. Ganesh |
视频video | |
概述 | Examines Capacitated Lot Sizing Problems (CLSP) in process industries with products having long/short setup times.Highlights real-life scenarios/considerations in process industries such as production |
图书封面 |  |
描述 | .This book examines the Capacitated Lot Sizing Problem (CLSP) in process industries. In almost all process industries, there are situations where products have short/long setup times, and the setup of the product and its subsequent production are carried over, across consecutive periods. The setup of a product is carried over across more than one successive period in the case of products having long setup times. A product having short setup has its setup time less than the capacity of the period in which it is setup. The setup is immediately followed by its production of the product and it may also be carried over, across successive time period(s). Many process industries require production of a product to occur immediately after its setup (without the presence of idle time between the setup and production of the product), and they also require the product to be continuously produced without any interruption. This book considers a single-machine, single-level and multiple-item CLSP problem. This book introduces the Capacitated Lot Sizing Problem with Production Carryover and Setup Crossover across periods (CLSP-PCSC). Mathematical models are proposed which are all encompassing that |
出版日期 | Book 2019 |
关键词 | Lot Sizing; Capacitated Lot Sizing Problem; CLSP; Production Carryover; Setup Crossover; CLSP-PCSC; Produc |
版次 | 1 |
doi | https://doi.org/10.1007/978-3-030-01222-9 |
isbn_ebook | 978-3-030-01222-9 |
copyright | Springer Nature Switzerland AG 2019 |