找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Advances in Production Management Systems. Production Management Systems for Volatile, Uncertain, Co; 43rd IFIP WG 5.7 Int Matthias Thürer,

[复制链接]
楼主: 浮华
发表于 2025-3-30 08:32:28 | 显示全部楼层
发表于 2025-3-30 16:25:08 | 显示全部楼层
发表于 2025-3-30 18:46:27 | 显示全部楼层
发表于 2025-3-31 00:42:02 | 显示全部楼层
Analytical and Computational Models for In-Store Shopper Journeysowever, retailing has received very little attention from researchers in terms of developing quantitative models that are used in the rest of the supply chain. This paper proposes analytical and computational models based on queuing theory and discrete-event simulation, respectively, for in-store sh
发表于 2025-3-31 01:07:56 | 显示全部楼层
A Meta-heuristic Approach for Industry 5.0 Assembly Line Balancing and Scheduling with Human-Robot Chuman-robot collaboration (HRC) is substantial. In HRC environments, human and robot operators share the workplace and can perform tasks simultaneously and collaboratively, amplifying work efficiency and operators’ welfare. This research investigates solutions to the assembly line balancing problem
发表于 2025-3-31 07:36:13 | 显示全部楼层
Game-Based Design of a Human-Machine Collaboration Monitoring Systemractions. Additionally, effective monitoring of the behavior of both human and machine agents during this collaboration poses significant challenges. The developed game-based process enables the analysis of the behaviours, leading to improved efficiency and collaboration. Indicators such as agent ut
发表于 2025-3-31 09:58:46 | 显示全部楼层
发表于 2025-3-31 14:38:48 | 显示全部楼层
A Bibliometric Perspective of Integrating Labor Flexibility in Workload ControlWLC) systems presents a critical yet underexplored facet of industrial operation. This research embarks on a comprehensive bibliometric and systematic literature network analysis crossing a decade of studies from 2014 to 2024, uncovering pivotal contributions and identifying prevalent themes in LF a
发表于 2025-3-31 19:45:49 | 显示全部楼层
https://doi.org/10.1007/978-3-663-02551-1 the model considering the following characteristics of the target ETO production site: (1) The planner has discretion in shortening required processing time; (2) Operation time is limited to day time of weekdays; (3) Overtime works can be accepted if necessary; (4) Some operations of multiple parts
发表于 2025-3-31 21:52:48 | 显示全部楼层
Klimaschutzgesetz und Klimapaket,E) in Industry 5.0. To evaluate the critical factors of success, this research has prioritized these factors using a fuzzy nonlinear approach based on the hierarchical analysis method and pairwise comparison tables based on linguistic variables. The results show that the existence of technical infra
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-21 05:19
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表