找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Advances of Science and Technology; 8th EAI Internationa Mulugeta Admasu Delele,Mekuanint Agegnehu Bitew,Ad Conference proceedings 2021 ICS

[复制链接]
楼主: HAVEN
发表于 2025-3-23 09:41:40 | 显示全部楼层
发表于 2025-3-23 17:04:29 | 显示全部楼层
Design and Experimental Test on Solar Powered Evaporative Cooling to Store Perishable Agricultural Pan ambient temperature with higher level of relative humidity for the storage of fresh Agricultural products such as tomato, carrot and green chili (pepper). The experimental setup is a rectangular shaped storage space made of galvanized steel for external cover, aluminum for internal cover insulate
发表于 2025-3-23 19:37:54 | 显示全部楼层
Effect of Oil Heat Treatment on Tensile and Bending Properties of Ethiopian Lowland Bamboo study Ethiopian lowland bamboo treated by oil in different treatment condition with hot oil and without hot oil. The treatment temperatures were 100, 130 and 160 °C with sun flower oil and treatment duration of 30, 60 and 90 min and bamboo immersed in oil for 2, 4 and 6 days without heat. After oil
发表于 2025-3-23 22:10:44 | 显示全部楼层
发表于 2025-3-24 03:15:03 | 显示全部楼层
发表于 2025-3-24 07:02:27 | 显示全部楼层
Modeling of Pore Parameters and Experimental Validation Using the Microstructure of 0.85Mo and 1.5Mo measuring the pore parameters is required to incorporate the intensification effect of the pore on the stress distribution. However, image analysis is the common practice employed to measure pore parameters, mathematical models may also use as an alternative method. Mathematical modeling of pore pa
发表于 2025-3-24 14:40:22 | 显示全部楼层
发表于 2025-3-24 16:24:15 | 显示全部楼层
发表于 2025-3-24 20:19:54 | 显示全部楼层
Effect of Drainage Blanket on Reducing Uplift Pressure Under Chute Spillway: A Case Study on Megech ather it allows the tail water to enter and surcharge the under-slab drainage system. If this drainage sand has been used on Megech dam spillway up to 12% uplift reduction around control section and an average of 3% reduction can be achieved at chute section of the spillway. Therefore, the provided
发表于 2025-3-24 23:10:22 | 显示全部楼层
Optimization of Rock Bolt and Concrete Lining Combination: A Case of AKH Railway Tunnel Projectnd. The result shows that the optimum combination can be found by increasing the number of rock bolts. The finite element analysis gives a total displacement of 6.34 cm in the best scenario case, which is slightly greater than the observed total displacement of about 6 cm. The total cost of rock bol
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-16 13:58
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表