找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Wastewater Treatment, Plant Dynamics and Management in Constructed and Natural Wetlands; Jan Vymazal Book 2008 Springer Science+Business M

[复制链接]
楼主: Considerate
发表于 2025-3-28 18:12:23 | 显示全部楼层
Nitrogen Removal by a Combined Subsurface Vertical Down-Flow and Up-Flow Constructed Wetland Systemstem operated with higher HLR. The removal efficiency for NH.-N and COD was maximum at 10 cm day. (79 and 74% respectively). Nitrification was significant in vertical down-flow bed, denitrification in the up-flow bed at every HLR. The two-stage constructed wetland removed 96–98% of incoming total su
发表于 2025-3-28 22:43:52 | 显示全部楼层
,Constructed Wetland Břehov: Three Years of Monitoring,epublic. The results also indicated that during the warm period (May–October) treatment efficiency for nitrogen and phosphorus was higher than that during cold period of the year (November–April). Removal of organics and suspended solids was not affected by the season. . reached its aboveground biom
发表于 2025-3-28 23:18:52 | 显示全部楼层
发表于 2025-3-29 03:20:07 | 显示全部楼层
Factors Affecting the Longevity of Subsurface Horizontal flow Systems Operating as Tertiary Treatmereed beds have deteriorated to the extent that they are close to failing to comply with the regulator’s requirements. Severn Trent Water Ltd. recognised this situation and has committed a budget for a programme of reed bed maintenance. Initially a budget was allocated to refurbish the reed beds in t
发表于 2025-3-29 08:15:28 | 显示全部楼层
发表于 2025-3-29 13:27:32 | 显示全部楼层
发表于 2025-3-29 19:09:10 | 显示全部楼层
发表于 2025-3-29 19:51:15 | 显示全部楼层
发表于 2025-3-30 01:09:44 | 显示全部楼层
发表于 2025-3-30 06:54:39 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-14 12:58
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表