尽责
发表于 2025-3-26 22:28:42
http://reply.papertrans.cn/43/4201/420003/420003_31.png
图表证明
发表于 2025-3-27 03:29:01
http://reply.papertrans.cn/43/4201/420003/420003_32.png
cavity
发表于 2025-3-27 05:53:15
http://reply.papertrans.cn/43/4201/420003/420003_33.png
项目
发表于 2025-3-27 12:35:58
http://reply.papertrans.cn/43/4201/420003/420003_34.png
Aggregate
发表于 2025-3-27 14:20:09
Behandlung einiger geometrischer Aufgabenft began in the fifties at Bedford with the “flying bedstead” experiments. The present-day GR7, FRS.2 and AV-8B Harrier are essentially upgraded versions of the original P1127 Harrier which first flew in 1960, the main differences being increased operating range, much advanced avionics and improved
HUMP
发表于 2025-3-27 20:01:49
,Überhöhungsrampe und Übergangsbogen,urbance rejection requirements into loop-shape requirements. However, when the approach is generalised for multivariable systems this task is somewhat more complicated. The problem arises in that different loops may have very different gains which in turn means that the directionality of references,
Volatile-Oils
发表于 2025-3-27 23:17:16
Überhöhungsrampe und Übergangsbogenesigned on linearisations of the plant for a set of values of these key parameters which cover the operating envelope, some way of moving between the controllers as the operating envelope is traversed is required. One possible approach is to assign subsets of the operating envelope to each linear co
THROB
发表于 2025-3-28 05:10:33
Überhöhungsrampe und ÜbergangsbogenIn this chapter an alternative approach is used which involves making the control law a continuous function of the key (scheduling) parameters. The approach involves obtaining a set of linearisations for a set of values of the scheduling parameter(s), designing a set of linear optimal controllers, a
Hla461
发表于 2025-3-28 07:28:22
http://reply.papertrans.cn/43/4201/420003/420003_39.png
Costume
发表于 2025-3-28 13:38:39
http://reply.papertrans.cn/43/4201/420003/420003_40.png