找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Reliability Evaluation of Power Systems; Roy Billinton,Ronald N. Allan Book 1984 Roy Billinton and Ronald N Allan 1984 education.engine.mo

[复制链接]
楼主: antithetic
发表于 2025-3-23 11:25:58 | 显示全部楼层
y Pitman Books in January 1983. As a sequel, this book is intended to be considered and read as the second of two volumes rather than as a text that stands on its own. For this reason, readers who are not familiar with basic reliability modelling and evaluation should either first read the companion
发表于 2025-3-23 16:22:37 | 显示全部楼层
发表于 2025-3-23 20:08:53 | 显示全部楼层
,Generating capacity—basic probability methods,ion of the actual capacity required to meet a given load level. Both these areas must be examined at the planning level in evaluating alternative facilities; however, once the decision has been made, the short-term requirement becomes an operating problem. The assessment of operating capacity reserves is illustrated in Chapter 5.
发表于 2025-3-24 00:57:37 | 显示全部楼层
Interconnected systems,nefits depend on the installed capacity in each system, the total tie capacity, the forced outage rates of the tie lines, the load levels and their residual uncertainties in each system and the type of agreement in existence between the systems [4].
发表于 2025-3-24 04:46:59 | 显示全部楼层
Operating reserve,ion plant. Once this capacity is scheduled and spinning, the operator is committed for the period of time it takes to achieve output from other generating plant; this time may be several hours in the case of thermal units but only a few minutes in the case of gas turbines and hydroelectric plant.
发表于 2025-3-24 07:35:33 | 显示全部楼层
发表于 2025-3-24 14:08:45 | 显示全部楼层
发表于 2025-3-24 16:34:34 | 显示全部楼层
Introduction,as possible. Modern society, because of its pattern of social and working habits, has come to expect the supply to be continuously available on demand. This is not physically possible in reality due to random system failures which are generally outside the control of power system engineers. The prob
发表于 2025-3-24 20:45:28 | 显示全部楼层
,Generating capacity—basic probability methods,d operation. The total problem can be divided into two conceptually different areas designated as static and operating capacity requirements. The static capacity area relates to the long-term evaluation of this overall system requirement. The operating capacity area relates to the short-term evaluat
发表于 2025-3-25 01:55:54 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-6-8 20:09
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表