找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Novel Technology and Whole-Process Management in Prefabricated Building; Conference Proceedin Ping Xiang,Liangdong Zuo Conference proceedin

[复制链接]
查看: 35319|回复: 64
发表于 2025-3-21 19:33:23 | 显示全部楼层 |阅读模式
书目名称Novel Technology and Whole-Process Management in Prefabricated Building
副标题Conference Proceedin
编辑Ping Xiang,Liangdong Zuo
视频video
概述Discusses industry difficulties.Gives solutions based on novel technologies.Promote the industrialization of the field.This book is open access, which means that you have free and unlimited access
丛书名称Lecture Notes in Civil Engineering
图书封面Titlebook: Novel Technology and Whole-Process Management in Prefabricated Building; Conference Proceedin Ping Xiang,Liangdong Zuo Conference proceedin
描述.This open access book discusses the challenges, methodologies, applications in construction, technology and whole-process management of prefabricated buildings. It is a valuable resource for building engineers looking to understand the effective use of technology, construction methods, and management systems. The contributions in this book highlight numerous exciting ideas that will spur novel research directions and foster multidisciplinary collaboration, ultimately advancing the industrialization of buildings and information technology..
出版日期Conference proceedings‘‘‘‘‘‘‘‘ 2024
关键词Prefabricated Building; Whole Process Management; Intelligent Construction Technology; New Building Tec
版次1
doihttps://doi.org/10.1007/978-981-97-5108-2
isbn_softcover978-981-97-5110-5
isbn_ebook978-981-97-5108-2Series ISSN 2366-2557 Series E-ISSN 2366-2565
issn_series 2366-2557
copyrightThe Editor(s) (if applicable) and The Author(s) 2024
The information of publication is updating

书目名称Novel Technology and Whole-Process Management in Prefabricated Building影响因子(影响力)




书目名称Novel Technology and Whole-Process Management in Prefabricated Building影响因子(影响力)学科排名




书目名称Novel Technology and Whole-Process Management in Prefabricated Building网络公开度




书目名称Novel Technology and Whole-Process Management in Prefabricated Building网络公开度学科排名




书目名称Novel Technology and Whole-Process Management in Prefabricated Building被引频次




书目名称Novel Technology and Whole-Process Management in Prefabricated Building被引频次学科排名




书目名称Novel Technology and Whole-Process Management in Prefabricated Building年度引用




书目名称Novel Technology and Whole-Process Management in Prefabricated Building年度引用学科排名




书目名称Novel Technology and Whole-Process Management in Prefabricated Building读者反馈




书目名称Novel Technology and Whole-Process Management in Prefabricated Building读者反馈学科排名




单选投票, 共有 0 人参与投票
 

0票 0%

Perfect with Aesthetics

 

0票 0%

Better Implies Difficulty

 

0票 0%

Good and Satisfactory

 

0票 0%

Adverse Performance

 

0票 0%

Disdainful Garbage

您所在的用户组没有投票权限
发表于 2025-3-21 22:09:34 | 显示全部楼层
Haiyang Li,Ti Zhang,Lei Huo,YiJie Wang,Shun Zhang,Lianjie Jiny. The second level is in relation to other EU institutions, notably in the context of the ‘soft’ macroeconomic policy co-ordination managed by the Council of Ministers (the Eurogroup) and the coordination with the Council on external monetary policy.
发表于 2025-3-22 03:12:19 | 显示全部楼层
Yihui Du,Zijing Zhang,Yuchao Huy. The second level is in relation to other EU institutions, notably in the context of the ‘soft’ macroeconomic policy co-ordination managed by the Council of Ministers (the Eurogroup) and the coordination with the Council on external monetary policy.
发表于 2025-3-22 07:22:36 | 显示全部楼层
发表于 2025-3-22 09:44:35 | 显示全部楼层
Mechanical Characteristics of Assembled Overhanging Composite Roadbed Structure,
发表于 2025-3-22 15:22:34 | 显示全部楼层
发表于 2025-3-22 18:07:13 | 显示全部楼层
Research on Existing Bridges Rapid Load-Lifting Technology with UHPC in Highways Reconstruction andly manifested by insufficient shear-bearing capacity after the load is improved. Using the bridge deck to add the UHPC cast-in-place layer (participating in the structural internal force) can effectively improve the existing old bridge Shear resistance capacity, and UHPC cast-in-situ layer shear rei
发表于 2025-3-22 21:51:30 | 显示全部楼层
Research on the Removal Sequence of Arch Rib Assembly Supports for Concrete-Filled Steel Tubular Tie element model was established using Midas Civil analysis software to analyze the stress of the two schemes. The results showed that the maximum stress of the steel pipe arch rib in the optimized scheme increased by 11.7 MPa, reaching 128.4 MPa, which is less than the material design strength; The
发表于 2025-3-23 03:18:33 | 显示全部楼层
Whole Process Management and Collaboration of Prefabricated Building Based on BIM,ing projects to be carried out more efficiently, and the application of BIM in prefabricated buildings can provide better user experience and satisfaction. This can promote the development of the construction industry in a digital and intelligent direction.
发表于 2025-3-23 08:04:48 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-9 11:46
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表