找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Construction Inspection Handbook; Total Quality Manage James J. O’Brien Book 1997Latest edition Springer Science+Business Media Dordrecht 1

[复制链接]
楼主: FAD
发表于 2025-3-25 03:35:33 | 显示全部楼层
QC Field Testingnever) the design engineer (or architect) chooses. It is recommended that the quality assurance (QA) procedures call for an index of all test requirements (or the requirements themselves) to be listed in Division 1 of the specifications (01400 Quality Control). If this has not been done during the design phase, the QC group must set up an .
发表于 2025-3-25 09:01:48 | 显示全部楼层
发表于 2025-3-25 13:29:35 | 显示全部楼层
发表于 2025-3-25 17:15:43 | 显示全部楼层
978-1-4613-7757-3Springer Science+Business Media Dordrecht 1997
发表于 2025-3-25 21:55:10 | 显示全部楼层
发表于 2025-3-26 01:48:59 | 显示全部楼层
发表于 2025-3-26 07:06:07 | 显示全部楼层
发表于 2025-3-26 08:53:42 | 显示全部楼层
发表于 2025-3-26 12:41:01 | 显示全部楼层
https://doi.org/10.1007/978-3-322-91685-3Quality assurance during the preconstruction phase should be structured to meet very definite responsibilities of the owner and the architect-engineer These include:
发表于 2025-3-26 20:33:33 | 显示全部楼层
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-6-27 21:44
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表