找回密码
 To register

QQ登录

只需一步,快速开始

扫一扫,访问微社区

Titlebook: Artificial Intelligence and Sustainable Computing; Proceedings of ICSIS Hari Mohan Dubey,Manjaree Pandit,Bijaya Ketan Pani Conference proce

[复制链接]
楼主: vein220
发表于 2025-3-25 04:16:36 | 显示全部楼层
Hari Mohan Dubey,Manjaree Pandit,Bijaya Ketan PaniPresents research works in the field of artificial intelligence and sustainable computing.Provides original works presented at ICSISCET 2020 held in Gwalior, India.Serves as a reference for researcher
发表于 2025-3-25 09:10:37 | 显示全部楼层
Algorithms for Intelligent Systemshttp://image.papertrans.cn/b/image/162325.jpg
发表于 2025-3-25 14:45:14 | 显示全部楼层
https://doi.org/10.1007/978-981-16-1220-6ICSISCET 2020; Sustainable Computing; Information Technology; Computational Intelligence; Machine Learni
发表于 2025-3-25 18:37:50 | 显示全部楼层
978-981-16-1222-0The Editor(s) (if applicable) and The Author(s), under exclusive license to Springer Nature Singapor
发表于 2025-3-25 21:54:07 | 显示全部楼层
Control of On-Board Electric Vehicle Charger,f EVs connected to distribution grid may create some problems in terms of over/under-voltage and power quality issues. Moreover, on-board EV charger may support the grid by exchange of active–reactive power with coordinated control. Therefore, this paper presents control architecture for an on-board
发表于 2025-3-26 03:10:54 | 显示全部楼层
,NSGA-III-Based Time–Cost–Environmental Impact Trade-Off Optimization Model for Construction Projectironmental impact of project is also a key indicator of projects’ success. In view of the increasing air pollution due to execution of numerous construction projects, few studies have been conducted to optimize the time–cost–environmental impact trade-off. Because of the exponential increase in the
发表于 2025-3-26 06:38:13 | 显示全部楼层
发表于 2025-3-26 10:10:07 | 显示全部楼层
,Simulated Annealing-Based Time–Cost Trade-Off Model for Construction Projects, of methods for the development of time–cost trade-off (TCT) models, this paper provides a simulated annealing-based TCT model. A construction activity has several alternatives with different amount of resources, due to which each alternative has different amount of execution time and cost. Many way
发表于 2025-3-26 13:44:08 | 显示全部楼层
,AHP and NSGA-II-Based Time–Cost–Quality Trade-Off Optimization Model for Construction Projects,paper provides a non-dominated sorting genetic algorithm II-based time–cost–quality trade-off optimization model for project scheduling. The study assumes that each activity of project has different alternatives accompanied by different time, cost and impact on entire project quality. The main objec
发表于 2025-3-26 18:01:18 | 显示全部楼层
A Wavelet-Based Segmentation Technique for Medical Images,aper describes the wavelet-based segmentation method for segmentation of medical images, particularly X-ray images, to locate any fracture in the bones. Of the images considered in this study, the third level of decomposition of Haar wavelet is found most suitable in terms of statistical image ident
 关于派博传思  派博传思旗下网站  友情链接
派博传思介绍 公司地理位置 论文服务流程 影响因子官网 SITEMAP 大讲堂 北京大学 Oxford Uni. Harvard Uni.
发展历史沿革 期刊点评 投稿经验总结 SCIENCEGARD IMPACTFACTOR 派博系数 清华大学 Yale Uni. Stanford Uni.
|Archiver|手机版|小黑屋| 派博传思国际 ( 京公网安备110108008328) GMT+8, 2025-5-10 01:03
Copyright © 2001-2015 派博传思   京公网安备110108008328 版权所有 All rights reserved
快速回复 返回顶部 返回列表