高歌
发表于 2025-3-26 21:58:22
http://reply.papertrans.cn/63/6233/623272/623272_31.png
Generalize
发表于 2025-3-27 02:17:29
Thomas Stoehr, used to make atomic the behaviour of processes refining actions; the denotational one uses tags expressing the start and the end of atomic sequences. Moreover, we define equivalences on both semantics, based on strong and rooted branching bisimulations, and we prove them . with respect to all the
Coma704
发表于 2025-3-27 07:38:10
http://reply.papertrans.cn/63/6233/623272/623272_33.png
Toxoid-Vaccines
发表于 2025-3-27 13:31:03
Thomas Stoehr, used to make atomic the behaviour of processes refining actions; the denotational one uses tags expressing the start and the end of atomic sequences. Moreover, we define equivalences on both semantics, based on strong and rooted branching bisimulations, and we prove them . with respect to all the
AWE
发表于 2025-3-27 14:57:36
ng machine asks questions to a nondeterministic polynomial-time Turing machine in such a way that the nondeterministic machine never accepts ambiguously. In contrast to guarded access, the standard notion of access to unambiguous computation is that of access to a set that is . unambiguous—even for
palpitate
发表于 2025-3-27 18:23:40
what has been done before. The extreme finds its expression in the belief that e-business projects need not be managed at all. Some people view project management for e business projects as an unnecessary bur978-3-540-42165-8978-3-642-56090-3
anesthesia
发表于 2025-3-27 22:47:27
http://reply.papertrans.cn/63/6233/623272/623272_37.png
爱花花儿愤怒
发表于 2025-3-28 03:18:01
http://reply.papertrans.cn/63/6233/623272/623272_38.png
Between
发表于 2025-3-28 06:19:52
http://reply.papertrans.cn/63/6233/623272/623272_39.png
凌辱
发表于 2025-3-28 12:44:14
Managing the Cost,t if it is completed within an approved budget that contains an acceptable level of profit for a contractor. Managing cost includes the processes required to . and to . cost. Cost estimation is a fundamental project management activity, and e-business projects are notoriously difficult to cost estim