书目名称Civil Engineering Quantities影响因子(影响力)<br> http://impactfactor.cn/if/?ISSN=BK0226874<br><br> <br><br>书目名称Civil Engineering Quantities影响因子(影响力)学科排名<br> http://impactfactor.cn/ifr/?ISSN=BK0226874<br><br> <br><br>书目名称Civil Engineering Quantities网络公开度<br> http://impactfactor.cn/at/?ISSN=BK0226874<br><br> <br><br>书目名称Civil Engineering Quantities网络公开度学科排名<br> http://impactfactor.cn/atr/?ISSN=BK0226874<br><br> <br><br>书目名称Civil Engineering Quantities被引频次<br> http://impactfactor.cn/tc/?ISSN=BK0226874<br><br> <br><br>书目名称Civil Engineering Quantities被引频次学科排名<br> http://impactfactor.cn/tcr/?ISSN=BK0226874<br><br> <br><br>书目名称Civil Engineering Quantities年度引用<br> http://impactfactor.cn/ii/?ISSN=BK0226874<br><br> <br><br>书目名称Civil Engineering Quantities年度引用学科排名<br> http://impactfactor.cn/iir/?ISSN=BK0226874<br><br> <br><br>书目名称Civil Engineering Quantities读者反馈<br> http://impactfactor.cn/5y/?ISSN=BK0226874<br><br> <br><br>书目名称Civil Engineering Quantities读者反馈学科排名<br> http://impactfactor.cn/5yr/?ISSN=BK0226874<br><br> <br><br>Slit-Lamp 发表于 2025-3-21 20:36:17
Method-related Charges and Pricing and Measurement of Civil Engineering Work, of items, and on completion of construction the work can be remeasured and valued at the billed rates. That the latter is unsatisfactory is evidenced by the large claims settlements agreed on many projects, where variations and unforeseen physical conditions or artificial obstructions occur.mettlesome 发表于 2025-3-22 03:46:19
http://reply.papertrans.cn/23/2269/226874/226874_3.pngzonules 发表于 2025-3-22 06:15:12
Beliefs and Psychiatric Symptomsrty to it. It gives the legal background to work under a contract and is required by many examining bodies. For more comprehensive and detailed information on the law of contracts, which is a most complicated subject, the reader might consult, for example, the books of reference. listed at the end of the chapter.folliculitis 发表于 2025-3-22 10:02:53
http://reply.papertrans.cn/23/2269/226874/226874_5.png和平主义 发表于 2025-3-22 14:37:48
https://doi.org/10.1057/9780230113039t the tenderer in relating prices more closely to costs and so simplifying estimating and assisting with the valuation of variations. A change of concrete mix or a variation in placing can be more readily accommodated by a change in the rate of one of the component items.和平主义 发表于 2025-3-22 20:20:38
https://doi.org/10.1057/9781137004895ork. The timber components are those used in permanent civil engineering work such as jetty timbers and fendering. Carpentry and joinery work to buildings should not be measured under this class, and a more appropriate method of measurement should be used, as illustrated in example IX.胰岛素 发表于 2025-3-23 00:40:19
http://reply.papertrans.cn/23/2269/226874/226874_8.pngBILK 发表于 2025-3-23 01:53:24
http://reply.papertrans.cn/23/2269/226874/226874_9.pngDEFER 发表于 2025-3-23 09:07:05
https://doi.org/10.1007/978-3-030-31856-7alone are covered by items that include both supplying and laying. ‘Supply’ includes delivery of components to the site, while ‘laying’ comprises all work subsequent to delivery of components to the site (Note S1).