certitude 发表于 2025-3-28 14:34:30

http://reply.papertrans.cn/87/8668/866704/866704_41.png

斗争 发表于 2025-3-28 19:50:48

http://reply.papertrans.cn/87/8668/866704/866704_42.png

聚集 发表于 2025-3-29 02:20:28

s clear that this production lead time is, for the majority of manufacturing firms, greatly in excess of the actual processing or manufacturing time. There are many reasons for this, among them poor coordination between the sales and manufacturing function. Some are within the control of the manufacturing fun978-0-412-58150-2978-94-011-1296-3

BUOY 发表于 2025-3-29 06:38:46

http://reply.papertrans.cn/87/8668/866704/866704_44.png

Cumulus 发表于 2025-3-29 07:38:54

A structured functional model for shop floor controln the architecture, that of FC. In our description of FC, we recognized the link between the production environment design element and the control element. Then taking each of the two elements in turn we described the individual tasks of each one.

Hectic 发表于 2025-3-29 11:55:33

http://reply.papertrans.cn/87/8668/866704/866704_46.png

Cultivate 发表于 2025-3-29 17:24:32

Implementation of a PAC systemuding the integration with existing applications (such as MRP and data collection systems), and the promotion of PAC, as a viable operational production control method, among those currently responsible for production operations.
页: 1 2 3 4 [5]
查看完整版本: Titlebook: Shop Floor Control Systems; From design to imple Alfred Bauer,Richard Bowden,Gerard J. Lyons Book 1994 Chapman & Hall 1994 Information Tech