Carcinoma 发表于 2025-3-23 11:25:58
y Pitman Books in January 1983. As a sequel, this book is intended to be considered and read as the second of two volumes rather than as a text that stands on its own. For this reason, readers who are not familiar with basic reliability modelling and evaluation should either first read the companionset598 发表于 2025-3-23 16:22:37
http://reply.papertrans.cn/83/8264/826354/826354_12.pngHabituate 发表于 2025-3-23 20:08:53
,Generating capacity—basic probability methods,ion of the actual capacity required to meet a given load level. Both these areas must be examined at the planning level in evaluating alternative facilities; however, once the decision has been made, the short-term requirement becomes an operating problem. The assessment of operating capacity reserves is illustrated in Chapter 5.裂缝 发表于 2025-3-24 00:57:37
Interconnected systems,nefits depend on the installed capacity in each system, the total tie capacity, the forced outage rates of the tie lines, the load levels and their residual uncertainties in each system and the type of agreement in existence between the systems .陶瓷 发表于 2025-3-24 04:46:59
Operating reserve,ion plant. Once this capacity is scheduled and spinning, the operator is committed for the period of time it takes to achieve output from other generating plant; this time may be several hours in the case of thermal units but only a few minutes in the case of gas turbines and hydroelectric plant.女歌星 发表于 2025-3-24 07:35:33
http://reply.papertrans.cn/83/8264/826354/826354_16.pngpacific 发表于 2025-3-24 14:08:45
http://reply.papertrans.cn/83/8264/826354/826354_17.pngVisual-Acuity 发表于 2025-3-24 16:34:34
Introduction,as possible. Modern society, because of its pattern of social and working habits, has come to expect the supply to be continuously available on demand. This is not physically possible in reality due to random system failures which are generally outside the control of power system engineers. The probfigurine 发表于 2025-3-24 20:45:28
,Generating capacity—basic probability methods,d operation. The total problem can be divided into two conceptually different areas designated as static and operating capacity requirements. The static capacity area relates to the long-term evaluation of this overall system requirement. The operating capacity area relates to the short-term evaluat谷物 发表于 2025-3-25 01:55:54
http://reply.papertrans.cn/83/8264/826354/826354_20.png