commune 发表于 2025-3-25 04:17:43
Proposal for Benchmark Problems to Assess Spillway and Overtopped Dams Structural Stability Using CFD,ng the related pressure fields and resultant forces, of overtopped gravity dams and spillways are difficult to accurately quantify. Recent advances in CFD (Computational Fluid Dynamics) have made this approach an attractive alternative to physical models. However, prior to using CFD with confidenceNebulizer 发表于 2025-3-25 09:23:47
http://reply.papertrans.cn/77/7646/764560/764560_22.pngDetonate 发表于 2025-3-25 12:13:06
http://reply.papertrans.cn/77/7646/764560/764560_23.png咽下 发表于 2025-3-25 19:32:11
http://reply.papertrans.cn/77/7646/764560/764560_24.pngHarrowing 发表于 2025-3-25 20:52:44
http://reply.papertrans.cn/77/7646/764560/764560_25.pngProtein 发表于 2025-3-26 01:46:00
Mario Freitas,Pierre Léger,Lineu Pedrosol journey, giving and receiving feedback on scholarly writing, and preparing for the oral defence. Also, based on research evidence, the book challenges taken-for-granted practices and policies surrounding doct978-94-007-9927-1978-94-007-0507-4就职 发表于 2025-3-26 04:19:52
http://reply.papertrans.cn/77/7646/764560/764560_27.png软弱 发表于 2025-3-26 08:37:27
http://reply.papertrans.cn/77/7646/764560/764560_28.png抛物线 发表于 2025-3-26 14:31:10
Effect of Release Height on the Motion of Particle Cloud in Stagnant Water, cloud’s width increased dramatically when sand particles were released above the water surface (i.e., . > 1). In addition, the horizontal dispersion of sand particles began earlier when sand particles were released above the water surface, and particle clouds reached the cloud’s deeper penetration length and width.paleolithic 发表于 2025-3-26 18:57:44
Study of Large-Scale Turbulence Horizontal Coherent Structures Under Ice-Covered Conditions,ed ice cover impacts the amplitude of the velocity oscillograms as well as markedly reduces the power intensity of the LSHCSs. Ice covers may also have an effect on the time and length scales of LSHCSs but not a significant one. The results of this work must be viewed as preliminary, as the number of measurements is limited.