Scheduling Semiconductor Test Operations: Optimization and Approximationenter at a time. A disjunctive graph representation of the facility is used to model the interactions of the workcenters. We present algorithms to minimize maximum lateness and number of tardy jobs on testers and batch processing machines. The overall methodology has been implemented on a set of problems based on a real industry setting.SHOCK 发表于 2025-3-28 19:41:30
in production planning, facilitylayout, inventory control, tool management and scheduling.Some of these problems can be solved off-line, whileothersmust be treated as real-time problems impacted by thechanging state of the system. Additionally, all of theseproblems have to be dealt with in an integrdegradation 发表于 2025-3-29 00:45:13
Analysis of Production Planning and Control (PPC) Systems as an Efficient Combination of Informationower lies in the formal stringency of its way of proceeding. Some authors see in the activity analysis, or in the consideration of production correspondences closely connected with it, a suitable platform for joining up the theory of production with production planning (Shephard et al. 1977).价值在贬值 发表于 2025-3-29 03:13:06
The Application of a Parallel Genetic Algorithm to the ,, Flowshop Problemns with respect to an objective. We conjecture that every new problem needs a determination of this necessary condition for a genetic algorithm to work, i. e. a proof by experiment. We implemented an asynchronous parallel genetic algorithm on a UNIX-based computer network. Computational results of the new heuristic are discussed.GOAT 发表于 2025-3-29 07:51:03
Job and Tool Scheduling for Flexible Machining Cellsf job completion times (as measured according to the weighted flow time criterion) and tool movement where the relative importance between these two potentially conflicting performance measures can vary from problem to problem. A heuristic procedure is proposed and evaluated in a experiment that draws on data from industry.旋转一周 发表于 2025-3-29 12:29:47
http://reply.papertrans.cn/67/6651/665076/665076_46.png沙草纸 发表于 2025-3-29 19:11:26
http://reply.papertrans.cn/67/6651/665076/665076_47.png散步 发表于 2025-3-29 21:25:57
Whither Manufacturing and Operations Research?cuss some of the history of the operations research (OR) profession, make some observations concerning its present state of health, and comment on the important role OR professionals can play in this national effort to help U.S. industry survive and thrive in the next century.细胞膜 发表于 2025-3-30 01:49:27
Dispatching Issues in Job Shop Scheduling made which (sub)lot has the highest priority. These competing lots may be sublots of either the same order or different orders. We suggest factors that should be included in a priority function. These factors are considered from both resource perspectives as well as order perspective.RADE 发表于 2025-3-30 07:01:54