mature 发表于 2025-3-21 17:06:26
书目名称Introduction to Engineering Statistics and Lean Six Sigma影响因子(影响力)<br> http://figure.impactfactor.cn/if/?ISSN=BK0473676<br><br> <br><br>书目名称Introduction to Engineering Statistics and Lean Six Sigma影响因子(影响力)学科排名<br> http://figure.impactfactor.cn/ifr/?ISSN=BK0473676<br><br> <br><br>书目名称Introduction to Engineering Statistics and Lean Six Sigma网络公开度<br> http://figure.impactfactor.cn/at/?ISSN=BK0473676<br><br> <br><br>书目名称Introduction to Engineering Statistics and Lean Six Sigma网络公开度学科排名<br> http://figure.impactfactor.cn/atr/?ISSN=BK0473676<br><br> <br><br>书目名称Introduction to Engineering Statistics and Lean Six Sigma被引频次<br> http://figure.impactfactor.cn/tc/?ISSN=BK0473676<br><br> <br><br>书目名称Introduction to Engineering Statistics and Lean Six Sigma被引频次学科排名<br> http://figure.impactfactor.cn/tcr/?ISSN=BK0473676<br><br> <br><br>书目名称Introduction to Engineering Statistics and Lean Six Sigma年度引用<br> http://figure.impactfactor.cn/ii/?ISSN=BK0473676<br><br> <br><br>书目名称Introduction to Engineering Statistics and Lean Six Sigma年度引用学科排名<br> http://figure.impactfactor.cn/iir/?ISSN=BK0473676<br><br> <br><br>书目名称Introduction to Engineering Statistics and Lean Six Sigma读者反馈<br> http://figure.impactfactor.cn/5y/?ISSN=BK0473676<br><br> <br><br>书目名称Introduction to Engineering Statistics and Lean Six Sigma读者反馈学科排名<br> http://figure.impactfactor.cn/5yr/?ISSN=BK0473676<br><br> <br><br>indenture 发表于 2025-3-21 22:08:53
Measure Phase and Statistical Chartingbles (KOVs) before changes are made. This information aids in evaluating effects of project-related changes and assuring that the project team is not harming the system. In general, quantitative evaluation of performance and improvement is critical for the acceptance of project recommendations. The more data, the less disagreement.Anticoagulants 发表于 2025-3-22 03:26:33
Control or Verify Phaselly increase quality and that they continue to do so. If the associated project involves new product or service design, this phase also involves confirmation. Since there is less emphasis on evaluating a process on an on-going basis, the term “.” refers evaluation on a one-time, off-line basis.Brocas-Area 发表于 2025-3-22 07:30:53
http://reply.papertrans.cn/48/4737/473676/473676_4.png重画只能放弃 发表于 2025-3-22 09:12:09
DOE: The Jewel of Quality Engineeringexperimental planning, conducting experiments, and fitting models to the outputs. An essential ingredient in applying DOE methods is the use of procedure called “randomization” which is defined at the end of this chapter. To preview, randomization involves making many experimental planning decisions using a random or unpatterned approach.EPT 发表于 2025-3-22 16:15:00
http://reply.papertrans.cn/48/4737/473676/473676_6.pngconception 发表于 2025-3-22 17:16:57
Regressionribed. Regression methods are perhaps the most widely used statistics or operations research techniques. Also, even though some people think of regression as merely the “curve fitting method” in Excel, the methods are surprisingly subtle with much potential for misuse (and benefit).insert 发表于 2025-3-23 00:09:07
http://reply.papertrans.cn/48/4737/473676/473676_8.pngCongeal 发表于 2025-3-23 01:36:57
http://reply.papertrans.cn/48/4737/473676/473676_9.pnggrotto 发表于 2025-3-23 09:29:59
http://reply.papertrans.cn/48/4737/473676/473676_10.png