Scheduling concepts with focus on the steel industry,mization. The variety of challenges can be clustered into three groups, i.e., challenges due to equipment and production setup, product portfolio and demand challenges, and the characteristics of quantitative scheduling tools.
Tonometry
发表于 2025-3-27 12:55:41
http://reply.papertrans.cn/47/4687/468638/468638_34.png
coagulation
发表于 2025-3-27 15:03:53
Scheduling of CCs and HSMs in the steel industry,This work focuses on two production steps continuous caster (CC) and hot strip mill (HSM), as illustrated in figure 17. Interestingly, production scheduling can have a major impact on energy efficiency at these production steps.