Computational Experiments,es is high due to minimum batch sizes of 250 tons and 500 tons at the CC and the HSM, respectively, a limit of up to 35 steel grades can be produced on both casters per day. Throughout the experiments, a short-term planning horizon of 28 days was considered. The plant operated 7 days per week and 24 hours per day.

lactic 发表于 2025-3-23 14:50:30

Conclusion,ies that only cover the MS to the continuous casting stage or from the HSM and further processing stages. However, most integrated steel mills do not fully exploit the cost savings opportunities offered by improved connection between stages, especially between the continuous casting and hot rolling stages.

织物 发表于 2025-3-23 21:50:20

Introduction,, is growing rapidly. This trend is also evidenced by the nation of origin for the largest steel producers; i.e., of the top five global steel producers, three are from China, and the remaining two are from Europe and South Korea, respectively (WSA 2012a).

Interim 发表于 2025-3-24 01:28:32

http://reply.papertrans.cn/47/4687/468638/468638_14.png

组装 发表于 2025-3-24 02:20:57

http://reply.papertrans.cn/47/4687/468638/468638_15.png

obsession 发表于 2025-3-24 08:02:08

http://reply.papertrans.cn/47/4687/468638/468638_16.png

Enervate 发表于 2025-3-24 11:58:33

Production planning and steel industry,in usually spans companies or organizational units of a single company (i.e., from the raw material supplier to the manufacturer to retailers) and the overarching aim of each supply chain is customer satisfaction (Chandra and Grabis 2007: 20, Govil and Proth 2002: 7, Christopher 2005: 5, Chopra and

懦夫 发表于 2025-3-24 15:12:29

http://reply.papertrans.cn/47/4687/468638/468638_18.png

DIKE 发表于 2025-3-24 21:32:41

Computational Experiments,alues and the characteristics of the scheduling tasks, e.g., the sequencing conditions or minimum batch sizes, were based on the real-life scheduling settings of a leading European steel company. We consider a steel plant with two CCs that differ in terms of production speed and product quality. The

Ganglion 发表于 2025-3-25 01:24:08