纺织品 发表于 2025-3-26 23:21:13
http://reply.papertrans.cn/47/4685/468486/468486_31.pnghappiness 发表于 2025-3-27 04:05:54
http://reply.papertrans.cn/47/4685/468486/468486_32.pngEbct207 发表于 2025-3-27 07:10:33
Representation of Assembly Plans for Product Families,ng (LB) or resource planning (RP) can be undertaken. It is thus necessary to present the eligible sequences to the user in an efficient way. This chapter is dedicated to the description of the proposed AP representation. Section 6.1 presents its main features; section 6.2 illustrates it with several examples; conclusions are drawn in section 6.3.泥瓦匠 发表于 2025-3-27 11:56:48
Preliminary Assembly Planning,omponents (GCs). This ordering needs not be complete and may be expressed by a set of precedence constraints (PCs). Thus, an assembly plan (AP) is a partial ordering of the assembly operations; an assembly sequence (AS) is a complete ordering, hence an AP is a set of ASs.ICLE 发表于 2025-3-27 16:01:39
http://reply.papertrans.cn/47/4685/468486/468486_35.pngAsparagus 发表于 2025-3-27 21:30:26
http://reply.papertrans.cn/47/4685/468486/468486_36.png松驰 发表于 2025-3-27 22:38:36
Pierre De Lit,Alain Delchambres should provide those who work int he emerging discipline of mathematicseducation with an essential resource, and at a time of considerable concern about the w978-90-277-2261-4978-0-306-47235-0Series ISSN 0924-4921 Series E-ISSN 2214-983XDOTE 发表于 2025-3-28 02:59:04
http://reply.papertrans.cn/47/4685/468486/468486_38.pngEVADE 发表于 2025-3-28 10:18:28
http://reply.papertrans.cn/47/4685/468486/468486_39.pngOPINE 发表于 2025-3-28 10:34:19
http://reply.papertrans.cn/47/4685/468486/468486_40.png