支架 发表于 2025-3-25 06:16:44

http://reply.papertrans.cn/43/4268/426763/426763_21.png

aerobic 发表于 2025-3-25 10:12:41

Decision Support System and Demonstration Application of High-Speed Railway Train Operation Under EAt present, the way that China’s railway operation management departments respond to railway emergencies still remains at the level of paper-based document inquiry and internal telephone communication, showing problems such as low efficiency of emergency response and lack of effective communication between railways.

biosphere 发表于 2025-3-25 15:13:25

Open Question,This chapter mainly introduces the open issues that need to be solved urgently by high-speed railway transportation organizations under the condition of emergency. These problems can be divided into three types of problems, including internal mechanism, resource allocation and information technology.

strdulate 发表于 2025-3-25 18:22:11

http://reply.papertrans.cn/43/4268/426763/426763_24.png

新义 发表于 2025-3-25 21:10:07

http://reply.papertrans.cn/43/4268/426763/426763_25.png

不合 发表于 2025-3-26 02:06:57

http://reply.papertrans.cn/43/4268/426763/426763_26.png

SEVER 发表于 2025-3-26 05:45:25

Estimation of Carrying Capacity of High-Speed Railway Section in Case of Emergency, system will be affected to varying degrees, the types and levels of emergencies. For example, the original block mode may be degraded, due to the interruption of traffic in certain sections or the adoption of train speed limit measures, and the carrying capacity will also change dynamically with th

削减 发表于 2025-3-26 11:19:08

Rerouting Path Generation in Emergency,t path refers to the path with the shortest transportation distance among multiple paths existing between any arrival and departure station, which is adopted by passenger trains under normal operation conditions.

圣歌 发表于 2025-3-26 13:32:16

Train Timetable Rescheduling for High-Speed Railway Under Emergency Conditions, the train schedule when the train actual timetable deviates from the train scheduled timetable and the train disordered. Adjustment of high-speed railway operation plan under emergency conditions is a very complicated and important task. Establishing a complete set of relevant theories, methods, an

Barrister 发表于 2025-3-26 20:31:16

esen zu generieren, die sowohl die arbeitsmarkttheoretischen Grundlagen befristeter Beschäftigung als auch die länderspezifischen institutionellen Rahmenbedingungen angemessen reflektieren. Insgesamt lassen sich drei Gruppen von Hypothesen voneinander unterscheiden. . können Aussagen über die Besetz
页: 1 2 [3] 4 5
查看完整版本: Titlebook: High-Speed Railway Operation Under Emergent Conditions; Theoretical Methodol Limin Jia,Li Wang,Yong Qin Book 2022 Beijing Jiaotong Universi