破译
发表于 2025-3-28 17:28:08
http://reply.papertrans.cn/31/3057/305680/305680_41.png
GENRE
发表于 2025-3-28 19:04:28
http://reply.papertrans.cn/31/3057/305680/305680_42.png
fleeting
发表于 2025-3-29 01:46:47
http://reply.papertrans.cn/31/3057/305680/305680_43.png
SLUMP
发表于 2025-3-29 05:18:05
http://reply.papertrans.cn/31/3057/305680/305680_44.png
assail
发表于 2025-3-29 08:38:41
Substation Expansion Planning,required expansion capacities of the existing substations as well as the locations and the sizes of new substations together with the required availability times, so that the loads can be adequately supplied.
驳船
发表于 2025-3-29 13:11:27
Book 2011on long-term issues, although much of the ideas may be used for short and mid-term cases, with some modifications. Back-up materials are provided in twelve appendices of the book. The readers can use the numerous examples presented within the chapters and problems at the end of the chapters, to make
故意钓到白杨
发表于 2025-3-29 17:19:14
http://reply.papertrans.cn/31/3057/305680/305680_47.png
朦胧
发表于 2025-3-29 20:28:17
Engagement, Hybridization and Resistance be the total fuel consumption, system losses, etc. which can be calculated upon determining the decision variables. In a ., the locations and the sizing of the capacitor banks are the decision variables, whereas the dependent variables may be bus voltages, system losses, etc.
独轮车
发表于 2025-3-30 01:10:14
https://doi.org/10.1007/978-3-86226-419-3required expansion capacities of the existing substations as well as the locations and the sizes of new substations together with the required availability times, so that the loads can be adequately supplied.