FIN 发表于 2025-3-26 21:48:24

http://reply.papertrans.cn/31/3013/301278/301278_31.png

逃避系列单词 发表于 2025-3-27 03:46:03

http://reply.papertrans.cn/31/3013/301278/301278_32.png

善于 发表于 2025-3-27 06:32:00

Oceanographic and geological research at ,: Instruments for predicting environmental conditions and rs (e.g. wave, tide and current), and sediment shifting in the windfarm. In the absence of in-situ measurements, a combination of fixed single-beam echosounders and full-coverage multibeam echosounding was applied to acquire a spatio-temporal dataset of scour dynamics at . ventus.

parsimony 发表于 2025-3-27 10:20:04

Marine habitat modelling for harbour porpoises in the German Bightle of describing patterns and dynamics of feeding habitats. As the modelling depends on the availability of coherent oceanographic and pressure data for the entire German Bight, the approach used combines hydrodynamic and noise models designed for the purpose.

讨厌 发表于 2025-3-27 14:26:48

Noise mitigation systems and low-noise installation technologies on relevant primary and secondary noise mitigation techniques (adjustment of piling energy, impulse prolongation, bubble curtains, hydro sound dampers, casings, cofferdams) and on selected low-noise installation technologies (vibro piling, drilling, gravity based foundations, suction buckets).

SUGAR 发表于 2025-3-27 19:39:00

http://reply.papertrans.cn/31/3013/301278/301278_36.png

bypass 发表于 2025-3-28 01:02:12

http://reply.papertrans.cn/31/3013/301278/301278_37.png

黑豹 发表于 2025-3-28 04:48:06

The Spatial Offshore Grid Plan for the German Exclusive Economic Zonen defines the power cable routes and sites for the entire required grid infrastructure in the EEZ up to the 12 nm border. The Grid Plan for the German EEZ in the North Sea and the accompanying Environmental Report were issued in February 2013 after two national and international consultations.

繁重 发表于 2025-3-28 08:38:42

The , offshore test sitearine grid connection proved reliable too, recording not a single interruption. Each year, . fed 267 GWh of power into the German grid, sufficient to supply approximately 70,000 households. It is the result of hard labour and a unique combined effort on the German high seas.

gustation 发表于 2025-3-28 12:46:57

http://reply.papertrans.cn/31/3013/301278/301278_40.png
页: 1 2 3 [4] 5 6 7
查看完整版本: Titlebook: Ecological Research at the Offshore Windfarm alpha ventus; Challenges, Results Federal Maritime and Hydrographic Agency,Federal M Book 201