A Study on the Evaluation of Pile Bearing Capacity Factor and Adhesion Factor in IS 2911 pile foundations. The given charts have been compared with various models specified in the existing literature and international standards for the calculation of N. and α for both driven and bored piles and, hence, the basis of Indian Standard charts has been identified. Moreover, it is evident tha
HPA533
发表于 2025-3-25 07:31:26
Challenges of Earthen Cofferdam in Deep Excavations for Waterfront Structures, a Case Studyinside slope of the embankment had started sliding due to continuous dewatering. The design and execution of deep excavation with earthen Cofferdam for waterfront structures are challenging. The selection of filling material for embankment formation and dewatering techniques plays a vital role in th
分贝
发表于 2025-3-25 14:14:43
http://reply.papertrans.cn/27/2646/264551/264551_23.png
花费
发表于 2025-3-25 19:01:57
Effects of Change in the Support System on Temporary Secant Pile Walls should be designed and checked for the critical forces from both permanent stage and construction stages. Since secant piles are used as a temporary retaining wall, only construction stage analysis is carried out to get the governing forces and deformation. In construction stage analysis, soil lay
一大群
发表于 2025-3-25 22:41:14
http://reply.papertrans.cn/27/2646/264551/264551_25.png
不要严酷
发表于 2025-3-26 00:56:18
http://reply.papertrans.cn/27/2646/264551/264551_26.png
monochromatic
发表于 2025-3-26 06:50:06
http://reply.papertrans.cn/27/2646/264551/264551_27.png
极力证明
发表于 2025-3-26 11:11:45
How Choice of Foundation Can Alter the Fate of a Bridge Project—Three Case Studiesee interesting case studies of past bridge projects, to demonstrate how correct choice of foundation can help to meet the project commitments, while the wrong choice of foundation can lead to a huge delay in project completion, leading to time and cost overrun.
拍翅
发表于 2025-3-26 15:52:24
http://reply.papertrans.cn/27/2646/264551/264551_29.png
态学
发表于 2025-3-26 18:09:23
https://doi.org/10.1007/978-1-4842-6180-4ee interesting case studies of past bridge projects, to demonstrate how correct choice of foundation can help to meet the project commitments, while the wrong choice of foundation can lead to a huge delay in project completion, leading to time and cost overrun.