水獭 发表于 2025-3-30 08:28:59
Influence of Given Parameter Errors on Accuracy of Tunnel Breakthrough by Heightel stake out with allowable deviation in transverse, longitudinal and height terms. Overhead network is developed before a tunnel is built and it connects entry and exit portal into a unique system. Underground network expands during tunnel construction. When evaluating the coordinates of newly assiOintment 发表于 2025-3-30 15:44:48
Design and Implementation of Special-Purpose Geodetic Networks for the Infrastructure Facilities ofconstruction of facilities, up to monitoring the behavior of the exploited facility. In case of large infrastructure facilities such as the highway, the design of the independent micro geodetic networks for all separate highway facilities (bridges, tunnels, viaducts, retaining walls, overpasses, un