召集会议 发表于 2025-3-21 19:12:13

书目名称Contributions to International Conferences on Engineering Surveying影响因子(影响力)<br>        http://impactfactor.cn/if/?ISSN=BK0237190<br><br>        <br><br>书目名称Contributions to International Conferences on Engineering Surveying影响因子(影响力)学科排名<br>        http://impactfactor.cn/ifr/?ISSN=BK0237190<br><br>        <br><br>书目名称Contributions to International Conferences on Engineering Surveying网络公开度<br>        http://impactfactor.cn/at/?ISSN=BK0237190<br><br>        <br><br>书目名称Contributions to International Conferences on Engineering Surveying网络公开度学科排名<br>        http://impactfactor.cn/atr/?ISSN=BK0237190<br><br>        <br><br>书目名称Contributions to International Conferences on Engineering Surveying被引频次<br>        http://impactfactor.cn/tc/?ISSN=BK0237190<br><br>        <br><br>书目名称Contributions to International Conferences on Engineering Surveying被引频次学科排名<br>        http://impactfactor.cn/tcr/?ISSN=BK0237190<br><br>        <br><br>书目名称Contributions to International Conferences on Engineering Surveying年度引用<br>        http://impactfactor.cn/ii/?ISSN=BK0237190<br><br>        <br><br>书目名称Contributions to International Conferences on Engineering Surveying年度引用学科排名<br>        http://impactfactor.cn/iir/?ISSN=BK0237190<br><br>        <br><br>书目名称Contributions to International Conferences on Engineering Surveying读者反馈<br>        http://impactfactor.cn/5y/?ISSN=BK0237190<br><br>        <br><br>书目名称Contributions to International Conferences on Engineering Surveying读者反馈学科排名<br>        http://impactfactor.cn/5yr/?ISSN=BK0237190<br><br>        <br><br>

兽群 发表于 2025-3-21 22:55:45

http://reply.papertrans.cn/24/2372/237190/237190_2.png

larder 发表于 2025-3-22 01:22:22

Possibility of Use of BIM in Automated Geometry Check of Structurese, identical to the one in which the measurements are made. The paper deals with the automated geometry check using data from TLS and BIM. Part of the paper is devoted to the derivation of information about the designed geometry from BIM exchange format Industry Foundation Classes (IFC). The automat

序曲 发表于 2025-3-22 07:33:01

http://reply.papertrans.cn/24/2372/237190/237190_4.png

斗争 发表于 2025-3-22 09:45:12

Determining Variance-Covariance Matrices for Terrestrial Laser Scans: A Case Study of the Arch Dam K laser scanner and showed results on simulated data for laboratory objects. Within this paper instrumental errors of the same scanner are modeled differently, according to recent work. A real scan of the arch dam Kops in Austria highlights influences on the variances, covariances and correlations of

labyrinth 发表于 2025-3-22 16:39:32

Testing Capabilities of Locata Positioning System for Displacement Measurements from 0.5 to 2.0 cm and in different directions were introduced. Positions of the rover after each introduced displacement were determined from single difference carrier phase measurements. From determined positions, displacements were calculated and compared to the true value of displacements. The

labyrinth 发表于 2025-3-22 20:14:33

First Step Towards the Technical Quality Concept for Integrative Computational Design and Constructit with the co-design-based development of building systems. In addition, the construction processes are modelled in order to allow quality propagation through the construction process. This contribution will deal with a first quality concept, a first quality model as well as exemplary quality charac

finale 发表于 2025-3-22 21:26:52

Analysis of Warm-up Effect on Laser Tracker Measurement Performance should be achieved after approximately 30–40 min. To verify this statement and quantify how much is laser tracker affected by warming up, a series of experiments were performed. Detailed description of the tests is provided together with numerical and graphical results. The final statement of the t

不开心 发表于 2025-3-23 02:24:18

Influence of Given Parameter Errors on Accuracy of Tunnel Breakthrough by Height errors of given parameters must be taken into account. In the example of the Tunnel Vežešnik in Montenegro, when designing a 1D underground network, a case was reviewed when previously established points were taken as given and when their error was considered. To validate this procedure, an accurac

objection 发表于 2025-3-23 07:28:30

http://reply.papertrans.cn/24/2372/237190/237190_10.png
页: [1] 2 3 4 5 6
查看完整版本: Titlebook: Contributions to International Conferences on Engineering Surveying; 8th INGEO Internatio Alojz Kopáčik,Peter Kyrinovič,Ante Marendić Confe