混沌 发表于 2025-3-25 03:35:33

QC Field Testingnever) the design engineer (or architect) chooses. It is recommended that the quality assurance (QA) procedures call for an index of all test requirements (or the requirements themselves) to be listed in Division 1 of the specifications (01400 Quality Control). If this has not been done during the design phase, the QC group must set up an .

Heretical 发表于 2025-3-25 09:01:48

http://reply.papertrans.cn/24/2361/236048/236048_22.png

竖琴 发表于 2025-3-25 13:29:35

http://reply.papertrans.cn/24/2361/236048/236048_23.png

阶层 发表于 2025-3-25 17:15:43

978-1-4613-7757-3Springer Science+Business Media Dordrecht 1997

高度赞扬 发表于 2025-3-25 21:55:10

http://reply.papertrans.cn/24/2361/236048/236048_25.png

INTER 发表于 2025-3-26 01:48:59

http://reply.papertrans.cn/24/2361/236048/236048_26.png

模仿 发表于 2025-3-26 07:06:07

http://reply.papertrans.cn/24/2361/236048/236048_27.png

污点 发表于 2025-3-26 08:53:42

http://reply.papertrans.cn/24/2361/236048/236048_28.png

骄傲 发表于 2025-3-26 12:41:01

https://doi.org/10.1007/978-3-322-91685-3Quality assurance during the preconstruction phase should be structured to meet very definite responsibilities of the owner and the architect-engineer These include:

CAJ 发表于 2025-3-26 20:33:33

http://reply.papertrans.cn/24/2361/236048/236048_30.png
页: 1 2 [3] 4 5 6
查看完整版本: Titlebook: Construction Inspection Handbook; Total Quality Manage James J. O’Brien Book 1997Latest edition Springer Science+Business Media Dordrecht 1