乱砍 发表于 2025-3-28 15:14:51

https://doi.org/10.1007/978-1-349-10021-7before work is under way, it cannot be assessed accurately at tender stage. The work is highly mechanised and therefore extremely expensive, but is also subject to severe constraints owing to limitations of access and area of working face, and the uncertainty of ground conditions.

阐明 发表于 2025-3-28 20:00:49

Palgrave Frontiers in Philosophy of Religionvered by items that include both supplying and laying. ‘Supply’ includes delivery of components to the site (rule C3), while ‘laying’ comprises all work subsequent to delivery of components to the site (rule C8). Where track is not to be supplied by the Contractor, the location is to be stated in ac

Interferons 发表于 2025-3-29 00:04:06

http://reply.papertrans.cn/23/2269/226873/226873_43.png

虚假 发表于 2025-3-29 07:02:45

https://doi.org/10.1007/978-3-658-31035-6at their meaning and purpose shall be generally understood. The term ‘measurement’ covers both (1) ‘taking-off’ dimensions by scaling or reading from drawings and entering them in a recognised form on specially ruled paper, called ‘dimensions paper’ (illustrated on page 73), and (2) the actual measurement of the work as executed on the site.

沐浴 发表于 2025-3-29 08:08:06

http://reply.papertrans.cn/23/2269/226873/226873_45.png

auxiliary 发表于 2025-3-29 15:18:49

http://reply.papertrans.cn/23/2269/226873/226873_46.png

intricacy 发表于 2025-3-29 19:21:18

What the Secularization Paradigm really saysnderer in relating prices more closely to costs and so simplifying estimating and assisting with the valuation of variations. A change of concrete mix or a variation in placing can be more readily accommodated by a change in the rate of one of the component items.

meditation 发表于 2025-3-29 21:24:58

http://reply.papertrans.cn/23/2269/226873/226873_48.png

加剧 发表于 2025-3-30 01:17:27

https://doi.org/10.1007/978-1-349-10021-7before work is under way, it cannot be assessed accurately at tender stage. The work is highly mechanised and therefore extremely expensive, but is also subject to severe constraints owing to limitations of access and area of working face, and the uncertainty of ground conditions.

NUL 发表于 2025-3-30 05:16:06

Palgrave Frontiers in Philosophy of Religionvered by items that include both supplying and laying. ‘Supply’ includes delivery of components to the site (rule C3), while ‘laying’ comprises all work subsequent to delivery of components to the site (rule C8). Where track is not to be supplied by the Contractor, the location is to be stated in accordance with rule A13 of Class S.
页: 1 2 3 4 [5] 6 7
查看完整版本: Titlebook: Civil Engineering Quantities; Ivor H. Seeley Textbook 1993Latest edition Ivor H. Seeley 1993 civil engineering.concrete.masonry