General Arrangement and Contents of Civil Engineering Bills of Quantities,work comprised in a Contract (1.7). (Perhaps the word ‘concise’ would be better substituted for ‘brief’.) All references in brackets refer to paragraphs in the . (paragraphs being the terminology used in CESMM3).
Anthrp
发表于 2025-3-23 20:55:36
Measurement of Concrete,nderer in relating prices more closely to costs and so simplifying estimating and assisting with the valuation of variations. A change of concrete mix or a variation in placing can be more readily accommodated by a change in the rate of one of the component items.
产生
发表于 2025-3-23 22:11:49
Measurement of Roads and Pavings,ycle tracks and other paved areas, together with the necessary kerbs, channels and edgings, traffic signs and surface markings. Landscaping, drainage, fences and gates, and gantries and similar structures supporting traffic signs are measured in accordance with the appropriate classes.
orthodox
发表于 2025-3-24 02:46:12
http://reply.papertrans.cn/23/2269/226873/226873_15.png
ALT
发表于 2025-3-24 10:13:12
http://reply.papertrans.cn/23/2269/226873/226873_16.png
entail
发表于 2025-3-24 13:30:02
http://reply.papertrans.cn/23/2269/226873/226873_17.png
储备
发表于 2025-3-24 18:48:08
Religiosität in der säkularisierten WeltEarthworks form a major part of most civil engineering contracts. The pricing of this work is made difficult by its relatively uncertain nature and extent and the effect of weather and water. The measurement rules attempt to recognise these factors and to permit the tenderer to make allowance for them.
corpuscle
发表于 2025-3-24 21:25:11
Religiosität in der säkularisierten WeltThis chapter covers several work sections from wall claddings to painting and waterproofing, with some common measurement principles running through them.