书目名称Building Quantities Explained影响因子(影响力)<br>        http://impactfactor.cn/if/?ISSN=BK0191730<br><br>        <br><br>书目名称Building Quantities Explained影响因子(影响力)学科排名<br>        http://impactfactor.cn/ifr/?ISSN=BK0191730<br><br>        <br><br>书目名称Building Quantities Explained网络公开度<br>        http://impactfactor.cn/at/?ISSN=BK0191730<br><br>        <br><br>书目名称Building Quantities Explained网络公开度学科排名<br>        http://impactfactor.cn/atr/?ISSN=BK0191730<br><br>        <br><br>书目名称Building Quantities Explained被引频次<br>        http://impactfactor.cn/tc/?ISSN=BK0191730<br><br>        <br><br>书目名称Building Quantities Explained被引频次学科排名<br>        http://impactfactor.cn/tcr/?ISSN=BK0191730<br><br>        <br><br>书目名称Building Quantities Explained年度引用<br>        http://impactfactor.cn/ii/?ISSN=BK0191730<br><br>        <br><br>书目名称Building Quantities Explained年度引用学科排名<br>        http://impactfactor.cn/iir/?ISSN=BK0191730<br><br>        <br><br>书目名称Building Quantities Explained读者反馈<br>        http://impactfactor.cn/5y/?ISSN=BK0191730<br><br>        <br><br>书目名称Building Quantities Explained读者反馈学科排名<br>        http://impactfactor.cn/5yr/?ISSN=BK0191730<br><br>        <br><br>

Yourself 发表于 2025-3-21 22:10:48

http://reply.papertrans.cn/20/1918/191730/191730_2.png

obligation 发表于 2025-3-22 01:21:04

Passive Electrical Flow in Neuronspicture and become reasonably familiar with the main details. The next step is usually a visit to the site to obtain details and measurements of any work required on the site, generally termed ‘siteworks’. These works include breaking up paving, taking down boundary walls and fences, felling trees,

stressors 发表于 2025-3-22 04:34:13

Passive Electrical Flow in Neuronsis two bricks thick or over, it is reduced to one-brick thick (S.M.M. G3a). It must also be classified in accordance with the latter clause, such as in ‘walls’, ‘skins of hollow walls’, etc., and must include full particulars of the bricks, bond and mortar (S.M.M. G2b).

图画文字 发表于 2025-3-22 12:15:39

http://reply.papertrans.cn/20/1918/191730/191730_5.png

CLAN 发表于 2025-3-22 15:11:26

Interdisciplinary Applied Mathematicsms are to be provided for foul and surface-water drainage, it is advisable to measure the drains and associated work in each system separately, although it is usually quicker and simpler to take all the manholes together.

调整校对 发表于 2025-3-22 20:42:19

http://reply.papertrans.cn/20/1918/191730/191730_7.png

Discrete 发表于 2025-3-22 23:42:12

Wave Propagation in Higher DimensionsSome of the general principles to be followed in ‘taking-off’ building quantities are detailed in the ‘General Rules’ in Section . of the .. The following clause is of particular importance:

为宠爱 发表于 2025-3-23 04:11:51

http://reply.papertrans.cn/20/1918/191730/191730_9.png

凶猛 发表于 2025-3-23 08:05:28

Passive Electrical Flow in NeuronsIt is essential that a logical order in ‘taking-off’ this class of work should be adopted to reduce the risk of omission of any items. The best procedure is probably to take each floor complete, commencing with the highest floor in the building and working downwards.