教育学 发表于 2025-3-26 21:04:03
Bill Preparation Processes, commences with an examination of the traditional method of bill preparation and then leads on to an investigation of the more recent processing techniques with their merits and demerits.空中 发表于 2025-3-27 02:01:00
http://reply.papertrans.cn/20/1918/191730/191730_32.pngANIM 发表于 2025-3-27 08:36:26
Measurement of Excavation and Foundations,picture and become reasonably familiar with the main details. The next step is usually a visit to the site to obtain details and measurements of any work required on the site, generally termed ‘siteworks’. These works include breaking up paving, taking down boundary walls and fences, felling trees, grubbing up hedges, earthworks, etc.malign 发表于 2025-3-27 10:23:20
Measurement of Brickwork, Facework and Blockwork,is two bricks thick or over, it is reduced to one-brick thick (S.M.M. G3a). It must also be classified in accordance with the latter clause, such as in ‘walls’, ‘skins of hollow walls’, etc., and must include full particulars of the bricks, bond and mortar (S.M.M. G2b).AGONY 发表于 2025-3-27 17:04:19
http://reply.papertrans.cn/20/1918/191730/191730_35.png厌恶 发表于 2025-3-27 18:48:39
http://reply.papertrans.cn/20/1918/191730/191730_36.pngbronchodilator 发表于 2025-3-27 22:56:43
Macmillan Publishers Limited 1966CLAIM 发表于 2025-3-28 03:42:58
http://reply.papertrans.cn/20/1918/191730/191730_38.png群居男女 发表于 2025-3-28 10:04:10
Passive Electrical Flow in Neuronspicture and become reasonably familiar with the main details. The next step is usually a visit to the site to obtain details and measurements of any work required on the site, generally termed ‘siteworks’. These works include breaking up paving, taking down boundary walls and fences, felling trees, grubbing up hedges, earthworks, etc.Ventilator 发表于 2025-3-28 10:47:40
http://reply.papertrans.cn/20/1918/191730/191730_40.png