环形 发表于 2025-3-26 23:28:00

http://reply.papertrans.cn/20/1918/191729/191729_31.png

引水渠 发表于 2025-3-27 04:04:30

Bill Preparation Processes,This chapter starts with an examination of the traditional method of bill preparation and then leads on to an investigation of the more recent processing techniques with their merits and demerits.

盲信者 发表于 2025-3-27 07:37:11

http://reply.papertrans.cn/20/1918/191729/191729_33.png

ALERT 发表于 2025-3-27 12:13:32

http://reply.papertrans.cn/20/1918/191729/191729_34.png

AVANT 发表于 2025-3-27 14:38:31

http://reply.papertrans.cn/20/1918/191729/191729_35.png

electrolyte 发表于 2025-3-27 21:31:37

Interdisciplinary Applied Mathematicsre to be provided for foul and surface water drainage, it is advisable to measure the drains and associated work in each system separately, although it is usually quicker and simpler to take all the manholes together.

VERT 发表于 2025-3-27 22:47:34

Building and Surveying Serieshttp://image.papertrans.cn/b/image/191729.jpg

剥皮 发表于 2025-3-28 05:06:57

http://reply.papertrans.cn/20/1918/191729/191729_38.png

幼稚 发表于 2025-3-28 09:07:00

http://reply.papertrans.cn/20/1918/191729/191729_39.png

过多 发表于 2025-3-28 10:40:28

Problems in Open Quantum Devices, tapering, and whether it has facework (finished fair) on one or both sides (SMM F10.1.1–3.1–4). It must include full particulars of the bricks or blocks, type of bond, composition and mix of mortar and type of pointing (SMM F10.S1–4).
页: 1 2 3 [4] 5 6
查看完整版本: Titlebook: Building Quantities Explained; Ivor H. Seeley Textbook 1988Latest edition Ivor H. Seeley 1988 building components.Drainage.foundation.meas