advocate 发表于 2025-3-21 19:07:22

书目名称Building Quantities Explained影响因子(影响力)<br>        http://impactfactor.cn/if/?ISSN=BK0191729<br><br>        <br><br>书目名称Building Quantities Explained影响因子(影响力)学科排名<br>        http://impactfactor.cn/ifr/?ISSN=BK0191729<br><br>        <br><br>书目名称Building Quantities Explained网络公开度<br>        http://impactfactor.cn/at/?ISSN=BK0191729<br><br>        <br><br>书目名称Building Quantities Explained网络公开度学科排名<br>        http://impactfactor.cn/atr/?ISSN=BK0191729<br><br>        <br><br>书目名称Building Quantities Explained被引频次<br>        http://impactfactor.cn/tc/?ISSN=BK0191729<br><br>        <br><br>书目名称Building Quantities Explained被引频次学科排名<br>        http://impactfactor.cn/tcr/?ISSN=BK0191729<br><br>        <br><br>书目名称Building Quantities Explained年度引用<br>        http://impactfactor.cn/ii/?ISSN=BK0191729<br><br>        <br><br>书目名称Building Quantities Explained年度引用学科排名<br>        http://impactfactor.cn/iir/?ISSN=BK0191729<br><br>        <br><br>书目名称Building Quantities Explained读者反馈<br>        http://impactfactor.cn/5y/?ISSN=BK0191729<br><br>        <br><br>书目名称Building Quantities Explained读者反馈学科排名<br>        http://impactfactor.cn/5yr/?ISSN=BK0191729<br><br>        <br><br>

拘留 发表于 2025-3-21 20:15:42

http://reply.papertrans.cn/20/1918/191729/191729_2.png

needle 发表于 2025-3-22 01:27:21

http://reply.papertrans.cn/20/1918/191729/191729_3.png

我正派 发表于 2025-3-22 05:13:58

Measurement of Chimney Breasts and Stacks, Fireplaces, Vents and Rubble Walling,y breast is located on an external wall, the chances are that the wall at the back of the fireplace with its external facework will be measured with the general brickwork, and the projecting breasts and chimney stack will be left to be measured later. With fireplaces on internal walls, it is probabl

故意 发表于 2025-3-22 08:56:31

Measurement of Drainage Work,re to be provided for foul and surface water drainage, it is advisable to measure the drains and associated work in each system separately, although it is usually quicker and simpler to take all the manholes together.

弓箭 发表于 2025-3-22 16:47:37

General Introduction,ngle sections in the membership of the Royal Institution of Chartered Surveyors, particularly since the amalgamation with the former Institute of Quantity Surveyors in 1983. Quantity surveyors are employed in private practices, public offices and by contractors, and they undertake a diversity of work.

大包裹 发表于 2025-3-22 19:04:58

Measurement of Excavation and Foundations,l picture and become familiar with the main details. The next step is usually a visit to the site to obtain details and measurements of any work required on the site, often termed siteworks. These works include breaking up paving, taking down boundary walls and fences, felling trees, grubbing up hedges, and similar work.

GRAZE 发表于 2025-3-22 22:06:24

Measurement of Brick and Block Walling, tapering, and whether it has facework (finished fair) on one or both sides (SMM F10.1.1–3.1–4). It must include full particulars of the bricks or blocks, type of bond, composition and mix of mortar and type of pointing (SMM F10.S1–4).

山羊 发表于 2025-3-23 02:58:00

Measurement of Drainage Work,re to be provided for foul and surface water drainage, it is advisable to measure the drains and associated work in each system separately, although it is usually quicker and simpler to take all the manholes together.

可以任性 发表于 2025-3-23 06:44:08

https://doi.org/10.1007/978-1-349-19343-1building components; Drainage; foundation; measurement; plumbing; preparation; roof
页: [1] 2 3 4 5 6
查看完整版本: Titlebook: Building Quantities Explained; Ivor H. Seeley Textbook 1988Latest edition Ivor H. Seeley 1988 building components.Drainage.foundation.meas